Laserfiche WebLink
D. The proposal includes construction of a new private access roadway and eight industrial <br />buildings, with average lot coverage by buildings of approximately 38 percent (plus <br />approximately 15 percent additional coverage associated with the roadway). Therefore, it <br />can be anticipated that implementation of the proposed project may result in potentially <br />significant impacts related to water quality, groundwater, drainage patterns, and increased <br />run-off. Preliminary hydrologic and hydraulic calculations prepared for the project indicate <br />that storm drainage effluent will be split between the Alameda County Flood Control & <br />Water Conservation District (ACFC) facilities located in Davis Street, and the jurisdictional <br />wetlands located in the southwest portion of the property. These wetlands are tidal impacted <br />through a city -owned storm drainpipe system running parallel to the railroad tracks at the <br />southern end of the site. The project site is located within the 100-year flood zone (Zone <br />VE), identified as coastal flooding with velocity. hazard (wave action). The base flood <br />elevation established is 71 feet. Properties to the south and east currently have problems <br />with flooding, which limits the amount of runoff that can be directed to the wetlands to the <br />south. In addition, in order to protect the salt -sensitive vegetation of the jurisdictional <br />wetlands, the applicant is proposing to limit the runoff rate from the portion of the site that <br />cannot drain to ACFC facilities in Davis Street. Potential impacts related to hydrology and <br />water quality can be adequately mitigated as long as mitigation identified by staff is <br />implemented prior to issuance of grading permits. The mitigation measures are conditions of <br />approval. <br />E. Construction -related activities are anticipated to occur over a period of 18 months, and <br />would be expected to generate substantial amounts of dust, which would result in temporary <br />potential health and nuisance impacts in the immediate project vicinity. Potential impacts for <br />construction -related air quality impacts can be adequately mitigated as long as mitigation <br />identified by staff is implemented prior to issuance of grading permits and during the <br />construction phase. The mitigation measures are conditions of approval. <br />F. The proposed project includes subdivision of the property into nine parcels, with eight of the <br />parcels to be developed with industrial buildings. As proposed, the existing on -site wetland <br />mitigation area, along with the new private access road would constitute the ninth parcel. <br />Two potentially significant impacts could result with this project as follows: 1) development <br />of the site, in particular the FedEx Ground facility to the east of the wetland mitigation area, <br />could affect the existing wetlands by increasing sedimentation during the grading phase and <br />increasing on -site impervious surfaces (with a resultant increase in site runoff) upon project <br />completion; and 2) the new private roadway as proposed would result in the removal of less <br />than 1/10 acre of wetland habitat (near the new crossing proposed for Waste Management). <br />Potential impacts related to on -site wetlands can be adequately mitigated as long as <br />mitigation identified by staff is implemented prior to issuance of demolition and grading <br />permits. The mitigation measures are conditions of approval. <br />G. The project site was utilized for approximately 60 years as a meatpacking plant, with associated <br />cattle pens and agricultural production. Phase I and II Environmental Assessments prepared for <br />the project site indicate that the potential exists for. asbestos -containing materials and lead - <br />based paint to be present on the site structures, given that they were constructed prior to the <br />early 1970's. In addition, several above -ground tanks are located on the property. Potential <br />Findings of Fact November 4, 2002 <br />PLN2002-00031 Bayside Business Park Page 6 of 7 <br />