My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2002-055 to 2002-060
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2002
>
MO 2002-055 to 2002-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 12:14:38 PM
Creation date
7/12/2022 11:51:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/2002
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
impacts related to hazardous materials in relation to proposed site demolition and development <br />on the project sites can be adequately mitigated as long as mitigation identified by staff is <br />implemented prior to issuance of demolition and grading pen -nits. The mitigation measures are <br />conditions of approval. <br />H. A traffic study prepared for the project indicates that the project will contribute towards year <br />2025 conditions at nearby project area intersections. In addition, the project will require <br />improvements along the public street frontage at the site in order to accommodate future plans <br />for improvements to nearby intersections. Local, non -signalized intersections (both at the <br />entrance to the project site and internally on the site) will require controls in order to facilitate <br />proper and safe movement of vehicles. Potential impacts related to the project's contribution <br />toward cumulative transportation impacts can be mitigated as long as mitigation identified by <br />staff is implemented. The mitigation measures are conditions of approval of the Planned <br />Development and Tentative Map approvals. <br />I. Site -specific wastewater, water supply and storm drainage information has not been fully <br />gathered and analyzed. Potential impacts related to wastewater, water supply and storm drain <br />discharge can be mitigated as long as mitigation identified by staff is implemented prior to <br />issuance of grading permits. The mitigation measures are conditions of approval. <br />There is no evidence of historical or archaeological resources within the project area. Potential <br />impacts to unknown resources can be adequately mitigated as long as mitigation identified by <br />staff is implemented during the construction phase. The mitigation measures are conditions of <br />approval. <br />GACommunity Development\.Staff Reports\Planning Commissiont2002\PLN2002-00031 FIND.doc <br />Findings of Fact November 4, 2002 <br />PLN2002-00031 Bayside Business Park Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.