Laserfiche WebLink
ADMINISTRATIVE REVIEW DRAFT <br />The requirement will probably have minimal impacts in the future because most of the multi -family <br />housing sites are located in redevelopment areas and are already subject to an inclusionary requirement. <br />The difference between market rate rents and the rents for the "affordable" units created under the <br />inclusionary housing ordinance is relatively small and fluctuates with market demand. The City could <br />consider requiring some of the units to be reserved for very low income households (50 % of areawide <br />median income [AMI]) rather than allowing all of the units to be made available at rents affordable to low <br />income households (80 % of AMI). This is already required within redevelopment areas, but is not <br />currently required for multi -family projects outside the redevelopment areas. <br />Building Code and Permit Processing Requirements <br />Analysis. San Leandro has adopted the Uniform Building Code (UBC), including standards recognizing <br />local seismic safety and geologic conditions. The City has made no special amendments to the UBC and <br />has no prohibitions on particular types of siding (such as T-111) or window/door materials. Class C (or <br />better) fire -retardant roofing is required, as it is in other East Bay cities where the risk of urban wildfire is <br />present. The City does not require interior sprinklers in single family homes. <br />As in other cities in the state, San Leandro does not allow the use of plastic (PVC) pipe for drain waste <br />and other interior plumbing systems. This requirement is presently being analyzed by the State of <br />California and may be changed in the future. Although the PVC pipe prohibition helps ensure the <br />durability of plumbing systems, it does represent an additional cost. <br />Building permit submittal requirements are clearly laid out in printed materials available at the Building <br />Permit counter. The City provides a checklist to assist the applicant in identifying all required materials. <br />Major projects typically require architect -drawn plans, engineering calculations, and standard <br />construction details. <br />The processing time (e.g., from submittal to issuance of the permit) for a complete application is usually <br />less than 30 days for a new residence and two to three weeks for an addition or major alteration.4 During <br />periods of very high application volumes, the City may retain contract plan checkers and inspectors to <br />minimize delays for applicants. The City is also working to make the process easier and more <br />convenient. It will soon have the capability to accept plans in digital format, comment on plans <br />electronically, and issue permits via the internet. In addition, the Building Department offers "one -stop <br />permitting," saving the applicant time and centralizing the process. A concerted effort has been made to <br />eliminate unnecessary steps and make the permitting process easy to navigate. <br />Conclusions. The City's building code requirements do not adversely impact the cost of construction in <br />the City. All requirements address basic health and safety considerations. Permitting practices and <br />procedures in San Leandro do not constitute a development constraint. The City continues to be open to <br />new ways to streamline permit processing and facilitate plan checking and inspections for applicants. <br />° These times vary depending on the complexity of the project. A three-story 4,500 square foot custom home in <br />Bay-0- Vista would require more time than a 1,500 square foot courtyard house in Cherrywood. <br />HOUSING ELEMENT 5-14 SAN LEANDRO GENERAL PLAN <br />4-1 _7,�, <br />