ADMINISTRATIVE REVIEW DRAFT
<br />Table 5-5: Major Fees Associated with New Housing Development in San Leandro
<br />Type of Fee
<br />Amount
<br />Park Development
<br />$4,259 per SF unit; $3,400 per MF unit.
<br />Note: The fee is lower if the site is in a subdivision where an on -site park
<br />or open space has been dedicated.
<br />Development Fee for Street
<br />$900 per unit (general); $450 per unit for senior housing
<br />Improvements (DFSI)
<br />Overhead Utility Conversion
<br />If in Undergrounding District, lesser of $575 per unit or actual cost (based
<br />on approximately $150/Linear Foot)
<br />Sewer Connection
<br />$1,036 for Single Family Unit; $846 for Multi -Family Unit
<br />Water Connection
<br />Collected by EBMUD; $2,580 per lateral, higher if the pipe diameter is
<br />larger than 1"
<br />For multi -family, costs range from $726 to 1,606 per unit, depending on
<br />how many units are served by each meter.
<br />Water System Capacity Charge
<br />$2,000 in flatlands (EBMUD "Region 1"); $3,040 in hills (EBMUD
<br />Region "4"); higher if the meter size is larger than 5/8"
<br />For multi -family, cost is $1,200 for each of the first 10 units; $960 for
<br />each additional unit in the same structure
<br />School Impact
<br />$2.05 per sq. ft. Example: Fee would be $4,100 for a 2,000 sq.ft house
<br />Building Permit
<br />Sliding scale based on project valuation. As an example, a $10,000
<br />remodel would have a permit fee of $130 for the first $2,000 plus $10.75
<br />for each additional $1,000, for a total of $216.00. A $200,000 project
<br />would have a permit fee of $1,021.50 for the first $100,000 and $4.25 for
<br />each additional $1,000, for a total of $1,446.50.
<br />Plan Checking
<br />Varies, but generally 80 percent of the building permit fee
<br />Electrical permit
<br />$48, plus $7.50-$18.50 per circuit
<br />Plumbing permit
<br />$48 plus per fixture charges. Other permit fees apply for swimming pools,
<br />spas, sewer and storm drain work, gas and oil piping, water and sewer
<br />systems, water heaters, etc.
<br />Heating, Ventilation and Air
<br />$48 plus unit fees per item, such as major appliances, central air,
<br />Conditioning Fees
<br />incinerators, etc.
<br />Certificate of Occupancy
<br />Direct costs, $108 minimum
<br />Roofing
<br />$22 plus sliding fee based on valuation (a $10,000 reroofing job would
<br />have a fee of $272)
<br />Variance and Conditional Use
<br />$550 for change use in existing structure; $625 for one or two family
<br />Permit
<br />residential; direct costs otherwise
<br />Administrative Variance
<br />$200
<br />Site Plan Review
<br />$200 for minor residential
<br />$300 for major residential
<br />$400 for major view preservation
<br />$625 for major view preservation w/ exception
<br />Parking Exception
<br />$120
<br />Zoning Approval
<br />$40
<br />PUD Filing Fees, Zoning Change,
<br />Direct Costs
<br />Environmental Review, Parcel
<br />Map, Tentative or Final Map
<br />Filing Fees
<br />Direct costs for planning projects include the hourly personnel wage, plus benefits, indirect overhead, and support
<br />staff overhead.
<br />Source: Barry Miller, AICP 2002
<br />HOUSING ELEMENT 5-16 SAN LEANDRO GENERAL PLAN
<br />-117A4
<br />
|