Laserfiche WebLink
ADMINISTRATIVE REVIEW DRAFT <br />Table 5-5: Major Fees Associated with New Housing Development in San Leandro <br />Type of Fee <br />Amount <br />Park Development <br />$4,259 per SF unit; $3,400 per MF unit. <br />Note: The fee is lower if the site is in a subdivision where an on -site park <br />or open space has been dedicated. <br />Development Fee for Street <br />$900 per unit (general); $450 per unit for senior housing <br />Improvements (DFSI) <br />Overhead Utility Conversion <br />If in Undergrounding District, lesser of $575 per unit or actual cost (based <br />on approximately $150/Linear Foot) <br />Sewer Connection <br />$1,036 for Single Family Unit; $846 for Multi -Family Unit <br />Water Connection <br />Collected by EBMUD; $2,580 per lateral, higher if the pipe diameter is <br />larger than 1" <br />For multi -family, costs range from $726 to 1,606 per unit, depending on <br />how many units are served by each meter. <br />Water System Capacity Charge <br />$2,000 in flatlands (EBMUD "Region 1"); $3,040 in hills (EBMUD <br />Region "4"); higher if the meter size is larger than 5/8" <br />For multi -family, cost is $1,200 for each of the first 10 units; $960 for <br />each additional unit in the same structure <br />School Impact <br />$2.05 per sq. ft. Example: Fee would be $4,100 for a 2,000 sq.ft house <br />Building Permit <br />Sliding scale based on project valuation. As an example, a $10,000 <br />remodel would have a permit fee of $130 for the first $2,000 plus $10.75 <br />for each additional $1,000, for a total of $216.00. A $200,000 project <br />would have a permit fee of $1,021.50 for the first $100,000 and $4.25 for <br />each additional $1,000, for a total of $1,446.50. <br />Plan Checking <br />Varies, but generally 80 percent of the building permit fee <br />Electrical permit <br />$48, plus $7.50-$18.50 per circuit <br />Plumbing permit <br />$48 plus per fixture charges. Other permit fees apply for swimming pools, <br />spas, sewer and storm drain work, gas and oil piping, water and sewer <br />systems, water heaters, etc. <br />Heating, Ventilation and Air <br />$48 plus unit fees per item, such as major appliances, central air, <br />Conditioning Fees <br />incinerators, etc. <br />Certificate of Occupancy <br />Direct costs, $108 minimum <br />Roofing <br />$22 plus sliding fee based on valuation (a $10,000 reroofing job would <br />have a fee of $272) <br />Variance and Conditional Use <br />$550 for change use in existing structure; $625 for one or two family <br />Permit <br />residential; direct costs otherwise <br />Administrative Variance <br />$200 <br />Site Plan Review <br />$200 for minor residential <br />$300 for major residential <br />$400 for major view preservation <br />$625 for major view preservation w/ exception <br />Parking Exception <br />$120 <br />Zoning Approval <br />$40 <br />PUD Filing Fees, Zoning Change, <br />Direct Costs <br />Environmental Review, Parcel <br />Map, Tentative or Final Map <br />Filing Fees <br />Direct costs for planning projects include the hourly personnel wage, plus benefits, indirect overhead, and support <br />staff overhead. <br />Source: Barry Miller, AICP 2002 <br />HOUSING ELEMENT 5-16 SAN LEANDRO GENERAL PLAN <br />-117A4 <br />