Laserfiche WebLink
ADMINISTRATIVE REVIEW DRAFT <br />Table 5-6: Fees for a Typical Single Family House (*) <br />Type of Fee <br />Amount <br />Building Permit <br />S1,476.25 <br />Plan Checking <br />$1,181.00 <br />Bld. Auto <br />$58.30 <br />Electrical <br />(varies) $275.00 <br />Plumbing <br />(varies) $325.00 <br />Mechanical <br />(varies) $165.00 <br />SMIP (Seismic) <br />$18.00 <br />Energy (Title 24) <br />$229.00 <br />Park In -Lieu <br />$4,259.00 <br />School Impact <br />$4,100.00 <br />Street Impact (DFSI) <br />$900.00 <br />Planning Dept. Review <br />$72.00 <br />Sewer Connection <br />$1,036.00 <br />Micro <br />$4.50 <br />Water Connection (EBMM fees) <br />$4,580.00 <br />TOTAL <br />$18,679.05 <br />Source: City of San Leandro, 2002 <br />Barry Miller, AICP, 2002 <br />(*) Based on 2000 square foot house with a 466 square foot garage <br />Chart 5-1: <br />Distribution of Fees <br />By Type <br />Electrical,Plumbing, Other <br />Source: Barry Miller, 2002 <br />HOUSING ELEMENT 5-17 SAN LEANDRO GENERAL PLAN <br />k4 7 5 <br />