My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2002-046 to 2002-050
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2002
>
MO 2002-046 to 2002-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 12:34:52 PM
Creation date
7/12/2022 12:33:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/2002
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2500 Davis Street <br />PLN2002-00031 <br />September 3, 2002 <br />Action 13.03-B — Require traffic analyses for new development that will generate <br />substantial volumes of traffic. Identify mitigation measures as appropriate to address <br />impacts. <br />Conformance: The Developer has submitted the required traffic report, which has been <br />reviewed and accepted by the Engineering and Transportation Department staff. <br />Mitigation measures are being recommended to mitigate anticipated cumulative impacts. <br />Action 13.04 —C Evaluate the need for public transit as part of the development review <br />process, both for new projects and for re -use or redevelopment projects. <br />Conformance: Project has been conditions to participate (by way of funding) in the <br />LINKS program. <br />Policy 14.04 — Require new development to incorporate design features that make <br />walking, cycling, and other forms of non -motorized transportation more convenient and <br />attractive <br />Conformance: Project has been conditioned to participate in City's LINKS program and <br />to provide bicycle parking for each of the new buildings. New sidewalks along the Davis <br />Street frontage and the new private roadway will provide pedestrian access to nearby bus <br />stops. <br />Policy 26.01 — Promote the long-term conservation of San Leandro's remaining natural <br />ecosystems, including wetlands, grasslands, and riparian areas. Future development <br />should minimize the potential for adverse impacts to these ecosystems and should <br />promote their restoration and enhancement. <br />Conformance: The project site contains jurisdictional wetlands, which are currently being <br />monitored by the Army Corps of Engineers. The project has been developed to minimize <br />impacts to the wetland area from on -site construction and drainage. <br />Permits and/or Variances Granted <br />Staff notes that should the proposal be denied, the current IG zoning designation would <br />allow development of a variety of uses that would not be allowed under the proposed <br />Planned Development (e.g., the current proposal would limit allowed uses to those that <br />are more in keeping with a business park setting). Depending on the specific uses <br />proposed discretionary review (e.g. a conditional use permit or administrative review) <br />might be required. For instance, if the Planned Development is denied, the FedEx Ground <br />facility would still require administrative review (by the Zoning Enforcement Official) <br />for a "small parcel processing center." <br />
The URL can be used to link to this page
Your browser does not support the video tag.