My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2000-011 to 2000-015
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2000
>
MO 2000-011 to 2000-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 2:43:32 PM
Creation date
7/12/2022 2:42:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/2000
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
impact due to the repetitive use by construction vehicles and the numerous excavations for sanitary <br />sewer and water installation and lateral connections, the Subdivider shall reconstruct Thornton Street <br />along project frontage up to the center line of street. <br />2. The subdivider shall analyze the existing illumination on Thornton Street and San Leandro Blvd for <br />compliance with City of San Leandro Minimum Street lighting requirements, and shall install <br />additional streetlights, if required along these roads. The location and construction of the electroliers <br />shall be approved by the City Engineer prior to approval of the Final Map of the project. <br />C. STORM DRAINAGE <br />1. Storm drainage service from the project shall be provided as directed and approved by the City <br />Engineer. The site shall be graded to maximize runoff over grassed and landscaped areas and <br />eliminate direct connections to the storm system and to ensure no runoff onto neighboring properties. <br />D. GRADING AND EROSION CONTROL <br />1. Prior to the approval of the first Final Map, the Subdivider shall submit all information including a <br />Grading Plan accompanied by Soils Engineering and Engineering Geology Reports, in the accordance <br />with requirements of the City of San Leandro Municipal Code Title VH, Chapter 12 and obtain a <br />grading permit. <br />2. The Subdivider shall comply with the regulations and provisions contained in the City's Grading <br />Ordinance, the City's Storm Water Pollution Prevention Permit, and the National Pollutant Discharge <br />Elimination System (NPDES), to the satisfaction of the City Engineer and the Regional Water Quality <br />Control Board. <br />3. The plans shall also include erosion control measures to prevent soil, dirt and debris from entering <br />the storm drain system, in accordance with the practices outlined in the ABAG Erosion and <br />Sediment Control Handbook, California Storm Water Best management practice Handbooks, and <br />the Regional Water Quality Control Board's Erosion and Sediment Control Field Manual. <br />4. Until such time as all construction for the development has been completed to the satisfaction of the <br />City Engineer, the Subdivider shall provide current Erosion & Sediment Control Plans, and amended <br />SWPPPs for all portions of the site where construction is ongoing. Said Plans shall be submitted to <br />the City Engineer for review and approval on or before September 1 of each calendar year, and shall <br />be fully implemented on or before October 15 of each calendar year. <br />E. WATER SYSTEM <br />1. Prior to approval of the Final Map for the project, the Subdivider shall submit signed agreements <br />with EBMUD, for the construction of the proposed water main connections. <br />2. EBMUD street fire hydrants with minimum fire flow and spacing in accordance with the San <br />Leandro Uniform Code will be required. Prior to installation, the City Engineer and the Fire <br />Department shall approve the number and location of the fire hydrants <br />VTM 7183 <br />F:\UAGTAR\VTM7183 <br />WESTCO COMMUNITY BUILDERS j <br />12/20/99 Page 3 of 5 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.