Laserfiche WebLink
PD-98-2 & Vesting Tentative Map Tract No.7078 Page 16 of 22 <br />Recommended Conditions of Approval February 9, 1999 <br />• On site EBMUD street fire hydrants with minimum fire flow and spacing <br />in accordance with the San Leandro Uniform Code will be required. Prior <br />to installation, the Fire Department shall approve the location of the fire <br />hydrants. A water supply shall be in place prior to combustible material <br />being moved into any phase of the project. <br />F. SANITARY SEWER SYSTEM <br />Sanitary sewer is available within the project site. However, the City's <br />Sanitary Sewer System Capability Study and Master Plan (1995) identified <br />capacity deficiencies in existing sewers in Peralta Avenue, Preda Street and <br />Davis Street (downstream of the project). The Subdivider may, at its cost, <br />provide additional analysis of the affected sanitary sewer system to provide <br />alternative solutions to the capacity deficiencies. If upsizing of the system is <br />required, the Subdivider shall construct the required improvements as part of <br />the subdivision improvements. Any approved sewer system upgrades shall <br />be completed prior to issuance of the first occupancy permit. The City will <br />assist the Subdivider in the formation of a Benefit District or other <br />mechanism to recoup costs of additional capacity created, that benefit future <br />developments utilizing this line. <br />All sanitary sewer lines that are to be maintained by the City shall be located <br />within easements on the private streets. The Subdivider shall install <br />manhole(s) at the point(s) of connection to public sewers to clearly <br />demarcate maintenance responsibilities. <br />The Subdivider proposes to utilize the existing abandoned 10" sanitary <br />sewer along the westerly project boundary along Central Pacific Railroad <br />property, to drain a portion of the sewage flows from the development to the <br />21" public sewer system. The Subdivider and/or the Home Owners' <br />Association shall henceforth own and maintain the 10" sanitary system. Any <br />sanitary sewer proposed to be abandoned shall be removed. <br />G. UNDERGROUNDING OF OVERHEAD UTILITIES <br />All overhead utilities along the extension of Alvarado Street must be placed <br />underground as part of the project. In addition, the utilities along Alvarado <br />between Antonio Street and San Leandro Creek must also be placed <br />underground. <br />Prior to the issuance of building permits for the first phase of the project, the <br />Subdivider shall pay the entire underground utility conversion fees, or enter <br />into an Underground Utility Agreement in accordance with the provisions of <br />the City Underground Utilities District Master Plan. <br />