Laserfiche WebLink
� Strategic Plan <br />TABLE 6-9. SAN LEANDRO SHARE IN COMPLIANCE COST <br />Percent <br />Design <br />Design <br />Actual <br />Actual <br />EBDA* <br />Capacity <br />Flow after <br />ADWF <br />Percent <br />ADWP <br />ADWF <br />Capacity <br />in <br />Reclamation <br />Percent <br />POTW <br />(mod) <br />ADWF <br />(mgd) <br />Percent <br />(mgd) <br />EBDA <br />(mgd) <br />Returned <br />San <br />7.6 <br />9 <br />4.5 <br />6 <br />22.3 <br />13 <br />3.2 <br />4 <br />Leandro <br />Oro Loma <br />20 <br />25 <br />20 <br />25 <br />69.2 <br />41 <br />20 <br />25 <br />Hayward <br />13.1 <br />16 <br />13.1 <br />16 <br />35 <br />21 <br />13.1 <br />16 <br />USD <br />24.2 <br />30 <br />27.3* <br />34 <br />42.9 <br />25 <br />28.6 <br />36 <br />LAVWMA <br />15.3 <br />19 <br />15.3 <br />19 <br />Only if <br />0 <br />15.3 <br />19 <br />available <br />Total <br />80.2 <br />80.2 <br />169.4 <br />80.2 <br />* Capacity based on joint powers agreement distribution (representative of distribution of fixed costs). <br />** For purposes of this report, it is assumed another agency such as Union SD would acquire San <br />Leandro's unneeded APWF capacity. <br />Operating Costs 1 6 1 3.5* 1 6 1 4 <br />* Based on ADWF at EBMUD of 120 mgd. <br />* * Based on Peak Flow at EBMUD of 290 mgd <br />00142.001 <br />6-12 <br />0 <br />- 123 <br />