My WebLink
|
Help
|
About
|
Sign Out
Home
MO 1998-066 to 1998-070
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
1998
>
MO 1998-066 to 1998-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 4:25:53 PM
Creation date
7/12/2022 4:20:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/1998
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP-28-98 MON 10:12 AM <br />Mr. Robert 0. Taylor <br />City of San Leandro <br />September 25, 1995 <br />Page 3 <br />COST ESTIMATE <br />SAN LEANDRO PUBLIC WORKS FAX NO. 5103521192 <br />P. 16 <br />The cost estimate for conveyance facilities described above is based on current construction. <br />cost (San Francisco Construction Cost Index 6600). Twenty percent (20%) is allocated for <br />engineering and administration and twenty-five percent (2513/o) for contingencies. <br />The cost estimate is shown in Table 1. <br />TABLE 1 - COST ESTIMATE <br />ON -SITE FACILITIES <br />Pumping Station Modification <br />Three 6 mgd pumps & motors <br />$ 200,000 <br />Two 2.9 mgd pumps & motors <br />60,000 <br />Variable speed drives & electrical <br />150,000 <br />Surge chamber <br />90,000 <br />Miscellaneous piping & metering <br />50,000 <br />Equalization Storage <br />Removal of mechanical equipment <br />100,000 <br />High pressure pumps & washdown system <br />270,000 <br />TOTAL ON -SITE CONSTRUCTION COST <br />920,000 <br />Engineering & Administration (20%) <br />180,000 <br />Contingencies (25%) <br />275,000 <br />TOTAL. ON -SITE CAPITAL COST <br />$1,375,000 <br />OFF -SITE FACILITIES <br />14,000 feet 24-inch steel pipe <br />2,400,000 <br />Jacking under Highway 880 <br />50,000 <br />Cathodic protection <br />50,000 <br />TOTAL OFF -SITE FACILITIES <br />2,500,000 <br />Engineering & Administration (20%) <br />500,000 <br />Contingencies (25%) <br />750,000 <br />7 0TAL OFF -SITE CAPITAL COST <br />$3, 750, 000 <br />TOTAL'PROJECT-CAPITAL `:C►OST<.''Y�„cr5.25;000 <br />139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.