My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1996-021 to 025
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1996
>
Reso 1996-021 to 025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 1:13:21 PM
Creation date
7/14/2022 12:01:51 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1996
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />District Agreement No. 4-1653-C <br />signalization of the southbound off -ramp at Davis Street will be <br />done. These improvements are referred to herein as "PROJECT". <br />(3) CITY has prepared and approved an initial <br />Study/Negative Declaration according to the laws of the <br />California Environmental Quality Act, which enables CITY to con- <br />struct a new "West Gate Parkway" south of Davis Street. The West <br />Gate Parkway will connect with the Southbound I-880 exit ramp at <br />the State Route 112 (Davis Street) intersection. The West Gate <br />Parkway is being planned by the City of San Leandro to improve <br />safety and congestion on Davis Street near the I-880 interchange <br />and to improve local street traffic circulation. <br />(4) CITY has requested STATE to modify the PROJECT de- <br />sign to relocate the southbound I-880 entrance ramps, to modify <br />the I-880 southbound exit ramp intersection and signal at Davis <br />Street, and to modify grading drainage and paving in order to al- <br />low the CITY's future construction of the West Gate Parkway ex- <br />tension to the south of Davis Street. Proposed changes are <br />hereinafter referred to as "IMPROVEMENTS". <br />(5) STATE has preliminarily agreed to allow CITY to <br />construct the West Gate Parkway portions of which will be in the <br />STATE right of way, and has preliminarily agreed to allow the <br />connection of West Gate Parkway to SR 112 (Davis Street), subject <br />to the STATE's final approval of a Project Study Report and <br />project Report, to be submitted by CITY prior to construction of <br />West Gate Parkway by CITY. <br />-2- <br />t�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.