Laserfiche WebLink
11. DOCUMENTS. All reports, data, maps, models, charts, studies, surveys, photographs, <br />memoranda or other written documents or materials prepared by Contractor pursuant to this <br />Agreement shall become the property of City upon completion of the work to be performed <br />hereunder or upon termination of the Agreement. <br />12. C ONIPLIANCE WITH APPLICABLE LAWS. Contractor shall comply with all laws <br />applicable to the performance of the work hereunder, including, but not limited to, laws <br />prohibiting discrimination based on race, religious creed, color, national origin, ancestry, physical <br />handicap, medical condition, marital status or sex. <br />13. USE OF RECYCLED PRODUCTS. Contractors shall prepare and submit all reports, <br />written studies and other printed material on recycled paper to the extent it is available at equal or <br />less cost than virgin paper. <br />14. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and each <br />page of construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal and <br />Signature of Registered Professional with report/design responsibility" as per sample below. <br />Professional w <br />responsibility <br />Exhibit D Page 5 4 5 <br />6/12/95 rev <br />