My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1996-046 to 050
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1996
>
Reso 1996-046 to 050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 12:20:59 PM
Creation date
7/14/2022 12:19:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1996
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORM DRAINAGE CONNECTION WILLIAMS STREET TO MERCED SHEET - SCOPE OF WORK <br />Task 1 - Preliminary Investigation: <br />1.00 Boundary Mapping: <br />The CONSULTANT shall determine the affected property lines based on available record <br />information, and prepare an AUTOCADD drawing. <br />1.10 Utility Mapping: <br />The CONSULTANT shall identify all known underground utilities along the storm drain <br />alignment. This shall be accomplished by reviewing available plans, contacting USA, and <br />thoroughly investigating the site. The CITY will provide potholing as needed to determine exact <br />locations of underground facilities. <br />1.20 Topographic Survey: <br />The CONSULTANT shall perform a topographic survey of the proposed alignment. The survey <br />shall include, cross sections every 25 feet fence line, top of curb, edge of pavement, edge of <br />building, and boundary corners, if possible. In addition, the CONSULTANT shall survey paint <br />marking placed by USA. <br />1.30 Base Mapping: <br />The CONSULTANT shall combine all topography, boundary, and utility information into one <br />electronic file. This file shall be the base for all design work. <br />1.40 Preliminary Alignment: <br />The CONSULTANT shall design the preliminary alignment in AUTOCAD version 12 format <br />per City of San Leandro Standards. <br />1.50 Drainage Calculations: <br />The CONSULTANT shall prepare drainage calculations to determine storm drain pipe diameters <br />and hydraulic freeboard. Depending on the available hydrology/hydraulic information, the <br />CONSULTANT may be forced to make conservative assumptions as to the existing hydraulic <br />conditions. This project is not intended to include a comprehensive area wide drainage study. <br />Drainage calculations shall be approved by Alameda County Flood Control. <br />1.60 Preliminary Legal Documents: <br />The CONSULTANT shall prepare a plat and description for a storm drain easement and a <br />temporary construction easement for submittal to the CITY. The plats and descriptions will be <br />on 8-1/2" x I V exhibits. <br />January 24, 1996 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.