Laserfiche WebLink
STORM DRAINAGE CONNECTION WILLIAMS STREET TO MERCED SHEET - SCOPE OF WORK <br />1.70 Cost Estimate: <br />The CONSULTANT shall prepare preliminary cost estimates for the proposed storm drain <br />project. Cost estimates shall include right-of-way costs and current industry unit costs for the <br />bid items. <br />1.80 Preliminary Specification: <br />The CONSULTANT complete draft specification for the preliminary submittal. The <br />CONSULTANT shall use the city standard boiler -plate along with CITY standard technical <br />specification. <br />1.90 Preliminary Submittal: <br />The CONSULTANT shall submit five (5) copies of drainage calculations, legal plats and <br />descriptions, estimates and preliminary alignment plans. <br />Task-2 Final Design: <br />2.00 Design Review Meeting: <br />After the CITY completes review of all design documents, the CONSULTANT shall meet with <br />the CITY to discuss all comments and direction for the project. <br />2.10 Final Plans: <br />The CONSULTANT shall finalize plans for construction. <br />2.20 Final Estimate: <br />The CONSULTANT shall update project costs for CITY budgeting. <br />2.30 Final Legal Documents: <br />The CONSULTANT shall complete legal plats and descriptions per CITY comments. <br />2.40 Final Specifications: <br />The CONSULTANT shall revise and finalize specifications for bidding. <br />2.50 Final Review: <br />The CONSULTANT shall meet with CITY to review final construction documents. <br />January 24, 1996 Page 2 <br />