Laserfiche WebLink
3.3.4. Construction Support <br />The Contractor shall provide support during the construction of the Marina <br />Park Restroom facilities as follows: <br />1. Answer questions during the bidding process. <br />2. Attend pre -bid meeting and record minutes of meeting. <br />3. Prepare project addenda as required. <br />4. Analyze bids received by the City and provide recommendations to <br />the City for award of the construction contract. <br />5. Attend pre -construction conference. (only architect to attend). <br />6. Review and approve project submittals. <br />7. Answer questions and provide clarifications as required during <br />construction. <br />8. Prepare construction contract change order drawings, descriptions, <br />etc. <br />9. Make visits (4 maximum) during construction as requested by the <br />City. <br />10. Attend one project completion walk-through and assist City in <br />developing corrective list. <br />11. Prepare as -built record drawings for Marina Park Restroom facilities <br />after construction is complete based upon drawings received from <br />the General Contractor. <br />Exhibit A <br />Page 7 of 7 <br />9/26/88 Rev. <br />1/20/90 Rev. <br />