My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1996-066 to 070
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1996
>
Reso 1996-066 to 070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 12:28:10 PM
Creation date
7/14/2022 12:26:41 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1996
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B-1 <br />FEE SCHEDULE <br />Section 3.2.1. Review of existing facilities and collection of background information <br />16 hours @ $55/hour $880 <br />Subtotal Section 3.2.1. not to exceed $880 <br />Section 3.2.3. Preliminary Design and Construction Estimates <br />A. <br />Initial Project Meetings and Site Visits - <br />• Meet with City staff to discuss project requirements and parameters. <br />8 hours @ $55/hour <br />440 <br />• City makes available existing pertinent data and standards (City task). <br />• Tour of at least four sites with City staff (included in 3.2.1). <br />B. <br />Determine building space requirements. <br />8 hours @ $55/hour <br />440 <br />C. <br />Prepare draft design concepts/schematics of at least three alternate restroom <br />designs rendered in color. <br />18 hours @ $55/hour <br />$990 <br />D. <br />Prepare preliminary cost estimates for each alternative. <br />3 each @ $250 <br />$750 <br />E. <br />Review alternative designs with City staff and develop consensus for proceeding <br />with selected alternative. <br />4 hours @ $55/hour <br />$220 <br />F. <br />Finalize design parameters and recommendations for final design. <br />12 hours @ $55/hour <br />660 <br />Subtotal Section 3.2.3 not to exceed $31500 <br />Section 3.2.4. Final Design and Estimates <br />A. Detailed design and final construction bid documents (included in Section 3.3.3). <br />B. Detailed estimates of quantities and construction costs: <br />Design Development Phase 750 <br />Construction Document Phase $1,500 <br />Subtotal Section 3.2.4 not to exceed $2,250 <br />Section 3.3.1. Reports <br />1. An inventory of the City's existing park restroom facilities (included in Section <br />3.2.1). <br />2. Presentation of current restroom standards for parks and any other relevant <br />guidelines. <br />16 hours @ $55/hour <br />3. Discussion and analysis of reconnaissance of records, site conditions and staff <br />comments. <br />8 hours @ $55/hour <br />Exhibit B-1 <br />Page 1 of 3 <br />HMO <br />$440 <br />
The URL can be used to link to this page
Your browser does not support the video tag.