Laserfiche WebLink
4. A comparison of the existing facilities to the stated standards and community <br />needs. <br />6 hours @ $55/hour $330 <br />5. Cost Comparisons for various design choices (included in Section 3.3.3). <br />6. Recommendations for final design incorporating suggested and selected <br />parameters. (Includes one meeting with City Staff) <br />6 hours @ $55/hour 330 <br />Subtotal Section 3.3.1 not to exceed $1,980 <br />Section 3.3.2. Cost Estimates <br />Included in Section 3.3.3 <br />Section 3.3.3 Plans and Specifications <br />Design Development: <br />80 hours @ $55/hour $4,400 <br />Construction Documents: <br />Architectural 225 hours @ $55/hour $12,375 <br />Structural Engineering $8,000 <br />Electrical Engineering $1,750 <br />Mechanical & Plumbing Engineering $2,800 <br />Civil Engineering $2,500 <br />Landscape Architecture $1,500 <br />Subtotal Section 3.3.3 not to exceed $337325 <br />Section 3.3.4 Construction Support <br />Answer questions during the bidding process. <br />8 hours @ $55/hour $440 <br />2. Attend pre -bid meeting and record minutes of meeting. <br />6 hours @ $55/hour $330 <br />3. Prepare project addenda as required. <br />4 hours @ $55/hour $220 <br />4. Analyze bids received by the City and provide recommendations to the City <br />for award of the construction contract. <br />2 hours @ $55/hour $110 <br />Exhibit B-1 <br />Page 2of3 <br />