Laserfiche WebLink
EXHIBIT A-4 <br />Permit No. 14-89 Page 1 of 1 <br />(Issued on March 7, 1990, As) <br />Amended Through April 15, 1994) <br />AIv1F.NDMENT NO. TWO <br />City of San Leandro <br />Page 7 <br />any inlet outlet structurc is to be used the nro,am shall include a <br />detailed drawing of such Mc•n re(s) with a schedule of ooeranon <br />incpPcrion and maintenance. <br />L <br />the soil measurements of salinity pH organic <br />content, and bulk density. Information shall also be provided on <br />the. water. including water analvsis of salinitypH biochemical <br />appropriate heavy metals. <br />whedule l he program snail in -iuuc a ,,, _ i - - <br />fill dredging orgr'ading will occur, the amc to be allowed for <br />settlement the time when levee breaches or inlet structures will <br />begin to function and the time when planting will occur. The <br />prograrn shall include an estimate of the extent of expecte <br />sedimentation over a ten-vear period. <br />g� Monitoring The permittee shall be responsible for monitoring the <br />site for five vears after the restoration project has been completed. <br />Such monitoring shall include measuring the water Quality, soil <br />characteristics plant survival and plant growth rates. Should -_ - <br />shall be carried out under the following five primary categories: <br />hydrology/sedimentation, vegetadon salt marsh harvest mouse. <br />and bird counts. In addition, tide heights hall be monitored and <br />compared to modeled tide elevations to "fine tune" tide gate <br />setrings The status of each of these monitoring categories shall be <br />measured against Zrformance criteria and corrective actions. <br />such as additional 121an6nz or re -grading, shall be carried out tf <br />annually Monitoring procedur s for the construction phase of the <br />Shoreline Marshlands Restoration project air described on 12 e <br />nine of the November 1992 Addendum to the Water Circulation <br />and Drainage Plan Post -construction monitoring l,r•oce ures an <br />performance criteria are describe on12ages ten through fifteen of <br />Ttstoration <br />site <br />as a result <br />of the <br />improvements <br />construcmd as part <br />of <br />this <br />permit <br />The�permittee <br />shall <br />assure that the <br />restoration plan meets <br />the <br />rcQuirements <br />of the <br />agencies <br />which have jurisdiction <br />over the <br />site <br />and <br />the surrounding <br />area. <br />The <br />al2olicant shall <br />provide a letter to <br />the <br />Commission <br />indicating <br />that the <br />rcvicw has bctn <br />done and that inland <br />areas <br />will not <br />flood as <br />a rnult of <br />the work shown <br />on the plan. <br />