Laserfiche WebLink
proposed development will occur consistent with the environmental <br />considerations identified in the General Plan. <br />B. The design and improvements of the proposed subdivision are consistent with <br />the General Plan, in that the subdivision includes a division of the property for <br />residential development which is compatible with the General Plan and will <br />promote the orderly development of subsequent phases. <br />C. The site is physically suitable for residential development in that the developable <br />area is flat terrain with less than three percent grade variation and is vacant. <br />D. The site is physically suitable for the proposed density of development in that <br />Phase 3 conforms with the density allowed in the Rezoning EIR and the General <br />Development Plan which indicates that there are adequate services available to <br />this development. <br />E. The design of the subdivision or proposed improvements are not likely to cause <br />substantial environmental damage or substantially and avoidably injure fish or <br />wildlife or their habitat because implementation of the mitigation measures <br />identified in the GDP Environmental Impact Report, the Supplemental <br />Environmental Impact Reports for Phase 1 and for Phases 2 and 3, the <br />conditions of approval for the Precise Development Plan for Phases 2A, 2B and <br />3, and the requirements imposed by other governmental agencies will ensure that <br />the proposed development will occur consistent with the environmental <br />considerations identified in the General Plan. <br />F. The design of the subdivision or type of improvements is not likely to cause <br />serious public health problems in that the environmental documents for the <br />General Development Plan and the Precise Development Plan for Phase 3 <br />include mitigation measures to bring any potential impacts to below a level of <br />significance. Furthermore, following the preparation of the Preliminary <br />Endangerment Assessment, some surface soils containing debris were removed <br />from Phase 1, under the direction of the Department of Toxic Substances <br />Control (DTSC). DTSC required no further action in Phases 1 and 2. An <br />Engineering Evaluation/Cost Analysis (EE/CA) to select a remediation <br />alternative for shallow soils in Phase 3 was prepared by Harding Lawson <br />Associates (HLA). The EE/CA was accepted by DTSC and the Regional Water <br />Quality Control Board (RWQCB). A Well Closure and Soil Remediation Work <br />Plan was also prepared by HLA and approved by DTSC and RWQCB. Most <br />of the Work Plan activities were completed between August and October 1995. <br />The remaining Work Plan activities are planned to be completed in the spring <br />of 1996. All remediation measures will be completed prior to occupancy of any <br />of the housing units in the Roberts Landing Residential Development. <br />-2- <br />