My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1996-091 to 095
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1996
>
Reso 1996-091 to 095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 1:24:37 PM
Creation date
7/14/2022 1:19:36 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1996
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Parking layout, signing and striping <br />2. Grading and drainage plan <br />3. Drainage profiles <br />4. East 14th Street signal modification plan <br />- Construction Details: Contractor shall provide pertinent <br />construction details to be included in plan set. <br />- Final Specifications: Contractor shall update specifications for <br />final submittal. <br />- Caltrans Pre -Submittal: Contractor shall submit final Signal and <br />Striping Plans to Caltrans for Encroachment Permit Review. <br />Contractor shall conduct meeting with Caltrans to review <br />comments. <br />Final Submittal: Contractor shall coordinate documents, <br />respond to redline comments and submit originals of approved <br />construction documents. <br />d. Lighting and signal plan with details (in Autocadd 12) <br />e. Irrigation plan with details <br />f. Planting plan with details <br />g. Technical specifications <br />h. Schedule of bid items and final estimate <br />Note: Item d, e, the coversheet and demolition plan would be hand drawn, <br />not CADD. <br />1.06 Contractor shall forward above to City, allowing for City staff review and <br />review staff comments in a single work session. <br />1.07 Contractor shall prepare 100 % submittal of task 1.03 items (due July 26, <br />1996) and forward to City staff. Contractor shall incorporate final comments <br />and forward tracings for City bid use. <br />1.08 Contractor shall submit construction quality control plan to include list of <br />contractor submittals and required reviews during construction. <br />Exhibit A <br />Page 2 of 3 <br />9/26/88 Rev.,1/10/90 Rev. <br />7/1/92 Rev. <br />
The URL can be used to link to this page
Your browser does not support the video tag.