Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 DEVELOPMENT SERVICES DEPARTMENT <br />Chapter 6 Fee Schedule - Building Regulations <br />Lighting fixtures, brackets, pendants, cord drops, outlets, <br />receptacles, switches and other lamp holding devices, each <br />on existing circuits .N .85 <br />Multi -outlet assemblies, light tracks, per linear foot -.55.60 <br />Temporary construction pole and attached wiring, each. 1-8.2518.50 <br />Temporary overhead or underground distribution supply, each 1-8.25 18.50 <br />Service or Service Change: <br />Services over 600 volts: <br />Up to 200 KVA, each 77.75 80. 00 <br />Over 200 KVA, each 77.75 80.00 <br />Services 600 volts or less, each <br />First 100 amp capacity 19.25 19.50 <br />Each additional 100 amp capacity or portion thereof 5-.N 5.25 <br />Service disconnecting means for $3r.7-5 $4.00 up to a maximum each <br />additional meter of $62.25 $64. 00 <br />Meter reset (lock -out inspection), each 20.75 21.00 <br />Appliances (connection or reconnection on existing circuits): <br />Domestic range, dryer, combination washer & dryer, furnace <br />or water heater, each 7-.7-5 8.00 <br />Electric range components, each range <br />(on existing circuits) 3-.74 4.00 <br />06-03-96 5 Electrical Code <br />