Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TIME 12 DEVELOPMENT SERVICES DEPARTMENT <br />Chapter 6 Fee Schedule - Building Regulations <br />12.6.105: ELECTRICAL. <br />(a) Maintenance Electrical Permit A fee of $6-2.25 $63.50 shall be paid for each annual maintenance <br />electrical permit at the time when such permit is issued. <br />(b) Electrical Permit, General The fee for an electrical permit shall include an issuance fee of <br />$15 50 $16.00 plus the amount shown below for each electrical item involved in the work. <br />(c) Minimum Electrical Permit Fee plus each 46.75 48.00 <br />item installed, based on the following table: <br />Circuits: <br />Installation, replacement or alteration of each <br />electrical circuit (includes related outlets, <br />switches, receptacle and lighting fixtures): <br />1 to 20 ampere circuit <br />21 to 30 ampere circuit <br />31 to 40 ampere circuit <br />41 to 50 ampere circuit <br />51 to 70 ampere circuit <br />71 to 100 ampere circuit <br />101 to 200 ampere circuit <br />Over 200 ampere capacity <br />Busway duct, per linear foot (on existing circuits) <br />7 2-5 7.50 <br />-972-5 8.50 <br />42.25$12.50 <br />18.0018.25 <br />$18.00 $18.50 PLUS $545 $5.50 <br />for each additional 100 ampere <br />capacity or fraction thereof. <br />WV1WJU <br />06-03-96 4 Electrical Code <br />