My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1997-051 to 055
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1997
>
Reso 1997-051 to 055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 3:59:14 PM
Creation date
7/14/2022 3:49:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1997
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Prepare the structural engineering documents to further establish and refine the <br />structural system developed in the Schematic Design Phase to establish the basic <br />structural system layout and dimensions, foundation design, sizing of major <br />structural components, critical clearances and specifications. The documents <br />shall be as follows: <br />1. Foundation Plan indicating appropriate size, shape and location of <br />footings to be strengthened and added. <br />2. Floor Plans indicating vertical structural components, i.e., columns, <br />lateral resisting frames and shear walls to be strengthened or added. <br />3. Floor Framing Plan indicating the layout and sizes of the primary <br />structural system components. <br />4. Roof Framing Plan indicating the layout and sizes of the primary <br />structural system components. <br />5. Primary Building Cross -Sections indicating primary structural system <br />components. <br />6. Typical Construction Details. <br />7. Outline Specifications. <br />C. Prepare the mechanical engineering documents to further establish and refine the <br />plumbing, HVAC mechanical and fire sprinkler systems developed in the <br />Schematic Design Phase to establish the basic system layouts, equipment sizes, <br />capacities and space requirements, acoustical and vibration control, visual <br />impacts and energy conservation measures. The documents shall be as follows: <br />1. Piping and Air -Duct Distribution Plans. <br />2. Fixture and Equipment Plans. <br />3. Outline Fixture and Equipment Schedules. <br />4. Roof Drainage Plan. <br />5. Typical Construction Details. <br />6. Energy Conservation Documents. <br />7. Outline Specifications for plumbing, HVAC and fire sprinkler systems. <br />D. Prepare the electrical engineering documents to further establish and refine the <br />electrical power and lighting systems developed in the Schematic Design Phase <br />and to establish the basic system layouts, equipment sizes, capacities and space <br />requirements and energy conservation measures. The documents shall be as <br />follows: <br />1. Power and Lighting Plans <br />2. Outline Fixture and Equipment Schedules <br />3. Typical Construction Details <br />4. Energy Conservation Documentation <br />5. Outline Specification <br />Page 4 of 10 <br />Exhibit A <br />05/01/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.