My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1997-051 to 055
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1997
>
Reso 1997-051 to 055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 3:59:14 PM
Creation date
7/14/2022 3:49:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1997
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(a) The Contractor shall not have control over or charge of and shall not be responsible for <br />construction means, methods, techniques, sequences or procedures, or for safety precautions and <br />programs in connection with the Work. <br />(b) The Contractor shall not be responsible for the construction contractor's schedules or <br />failure to carry out the Work in accordance with the Contract Documents. <br />(c) The Contractor shall not have control over or charge of acts or omissions of the <br />construction contractor's, it's subcontractors, or their agents or employees, or of any other <br />persons performing portions of the construction contractor's Work. <br />(d) The Contractor shall provide the services in a timely manner and in general conformance <br />with the master schedule included in Exhibit B-1. <br />(e) The Scope of Services does not include services, which may be required to be provided on <br />account of "design suggestions", which may be selected by the City, from the Architectural -Peer <br />Review document prepared for the Project. At such time the City selects the "design <br />suggestions" to be incorporated into the scope of the Project the Contractor and the City shall <br />determine a mutually agreeable scope of services to be provided by the Contractor on account of <br />the selected "design suggestions". The Contractor and the City shall also determine if the <br />service(s) to be provided by the Contractor, shall be provided as a basic service, without any <br />additional compensation paid to the Contractor, or shall be provided as an extra or additional <br />service, with additional compensation paid to the Contractor. The services to be provided, shall <br />generally revise the architectural and the structural, mechanical and electrical engineering <br />Schematic Design Phase documents, inclusive of drawings and outline specifications, to conform <br />with the expressed intent of the selected "design suggestions". <br />Page 10 of 10 <br />Exhibit A <br />05/01/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.