Laserfiche WebLink
14. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and <br />each page of construction drawings shall be stamped/sealed and signed by the licensed <br />professional responsible for the report/design preparation. The stamp/seal shall be in a <br />block entitled "Seal and Signature of Registered Professional with report/design <br />responsibility" as per sample below. <br />Seal and Signature of Registered Professional with <br />report/design responsibility <br />Exhibit D Page 6 of 6 <br />6/12/95 rev (Word 6.0) <br />AGRE\EXHIBITD.DOC <br />