Laserfiche WebLink
4. Prior to the approval of the first Final Map, the maintenance access to the storm drain on <br />Lot 23, shall be approved by the City Engineer and Alameda County. The location of <br />Road "B" over the existing storm drain facilities shall also be approved in writing by <br />Alameda County. <br />5. Street lighting, maintained by the Homeowners' Association, shall be provided over the <br />entire private street system, to the satisfaction of the City Engineer. The Subdivider shall <br />analyze the existing illumination levels on the access road, Chapman Road and Fremont <br />Avenue for compliance with the City of San Leandro minimum street lighting <br />requirements, and shall install additional streetlights, if required, along these roads. The <br />location and construction of the electroliers shall be approved by the City Engineer prior <br />to approval of the first Final Map of the project. <br />6. Handicap ramps shall be provided at appropriate locations throughout the subdivision, as <br />directed by the City Engineer. <br />7. The Subdivider shall provide pedestrian access to and from the development along <br />Chapman Road. Sidewalk shall be constructed along the full project frontage along <br />Chapman Road, to connect to existing sidewalk on Chapman Road. <br />8. The entry into the subdivision from Fremont Avenue shall have decorative pavers and <br />crosswalk across the entrance. <br />C. STORM DRAINAGE <br />1. All storm water runoff from the project and from the proposed concrete swale on the <br />neighboring property behind Lots 21,22 and 23 shall be collected in an underground <br />system and conveyed to an appropriate storm drain system. Hydrologic and hydraulic <br />calculations shall be reviewed and approved by the City Engineer and the Alameda <br />County Public Works Agency. <br />2. The Subdivider proposes to include portions of the existing storm drain easement on Tract <br />7093 within proposed Lot 23. Prior to approval of the first Final Map, Subdivider shall <br />submit written approval from the Alameda County Public Works Agency. The Subdivider <br />shall make necessary payments to the County for its review. <br />3. The Subdivider shall provide a detailed capacity analysis of the existing City and County <br />storm drain system through the subject property. Any improvements needed as a result of <br />this analysis to accommodate flows from the project shall be approved by the City <br />Engineer and the Alameda County Public Works Department prior to the approval of the <br />Final Maps for Tract 7092 and Tract 7093. The Subdivider shall pay all costs of the <br />required improvements. <br />4. The proposed connections to Alameda County facilities shall be approved in writing by t <br />he Alameda County Public Works Agency. <br />Chapman Place <br />Vesting TM 7092 & 7093 <br />6/04/99 Page 5 of 9 <br />