Laserfiche WebLink
Task 6 - Database and Graphics for Signals <br />For the 20 signals brought on-line to the ICONS system in Task 5, enter controller configuration <br />parameters and timing parameters in the ICONS database. Also create dynamic maps and intersection <br />graphics for these signals. It is assumed that signal timings will be existing or provided by others, and will <br />not be developed by DKS. <br />Deliverables: Create ICONS graphics and database, after approval of Task 4. <br />Delivery Schedule: 6 weeks (begins six weeks after start of construction). <br />Agreement Page 6 of 18 <br />3/7/94 Rev. <br />