Laserfiche WebLink
_ , ' Mr. Steve Fitzsimons Page 9 November 5, 1996 <br />Task 1.0 - System Design: [TOTAL = $2,040] <br />TJKM will meet with CT Net developers and the TOC to discuss basic system design such as <br />hardware needs, communications, system architecture, and program operation. <br />Task 2 - Data Acquisition and Compiling Module: [TOTAL = $25,6801 <br />Task 2.1: Detector Data (CT Net/170) - write a program which enables the Traffic <br />Database to access detector data (volume and occupancy) in 170 controllers, in 15 minute <br />increments, and convert detector data to Traffic Database input data (another program <br />below, Store System Configuration, sets up Traffic Database in terms of detector <br />assignments and addresses, etc.). <br />Resources: 6 hours to meet with Caltrans and review specific detector data formats in <br />CT Net and load and work sample data, and another 18 hours to write and debug a <br />translation program (total cost = $3,120) <br />Task 2.2: Detector Data (Econolite/Traconex) - write a program which enables the <br />Traffic Database to access detector data (volume and occupancy) in Econolite controllers, <br />in 15 minute increments, and convert detector data to Traffic Database input data <br />(another program below, Stored System Configuration, sets up Traffic Database in terms <br />of detector assignments and addresses, etc.). <br />Resources: 8 hours to meet with Econolite and Traconet, and review specific detector <br />data formats in Zone Master and Traconet, and load and work sample data, and another <br />16 hours to write and debug a translation program (total cost = $3,360) <br />Task 2.3: Controller Signal Timing Data (CT Net) - write a program which converts <br />controller data regarding programmed splits, offsets and coordination plans with actual <br />splits, offsets and coordination plans (by cycle and/or last 15 minutes - assumed only <br />functional when toggled on) to Traffic Database input data. <br />Resources: no need for independent meeting (see Task 1.1), writing program to convert <br />controller data to Traffic Database is 18 hours including debugging ($2,160) <br />Task 2.4: Controller Signal Timing Data (Econolite and Traconex) - write a program <br />which converts controller data such as programmed splits, offsets and coordination plans <br />with actual splits, offsets and coordination plans (by cycle and/or last 15 minutes - <br />assumed only functional when toggled on - such as F10 turns on "Split Monitor" in <br />Traconex and delivers output to both screen and printer) to Traffic Database input data. <br />Resources: no need for independent meeting with vendors (see Task 1.2), writing <br />program to convert controller data to Traffic Database is 20 hours including debugging <br />($2.400) <br />Task 2.5: Event Data (CT Net) - write a program which converts event monitor data <br />from signal controllers and CT Net to Traffic Database input data. <br />Resources: no need for independent meeting with Caltrans/CT Net developers (see <br />Task 1.1), writing program to convert controller event monitor data to Traffic Database <br />format is 14 hours including debugging ($1,680) <br />