My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1998-081 to 085
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1998
>
Reso 1998-081 to 085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 5:27:49 PM
Creation date
7/14/2022 5:24:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1998
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 PUBLIC WORKS <br />Chapter 5 Uniform Wastewater Discharge <br />Regulations <br />unusually high measurement if it is judged to not be representative of a user's long- <br />term use of the wastewater system and/or can be explained by a one-time event. <br />User charges shall include a demand charge and a loading charge. Demand charges <br />shall be based on the average day (using normal work days) for the peak month <br />discharge for the prior fiscal year or on an estimate of peak month parameters as <br />provided for in subparagraph (d) below. If a User elects to submit an estimate of this <br />peak month demand rather than use the prior year's peak month, the User must <br />demonstrate to the Director's satisfaction that the User has or will soon implement <br />substantial changes in plant processes which are likely to result in substantial <br />reductions in the peak month discharge. Otherwise, the prior year's peak month <br />demand shall be used to assess demand charges for the following fiscal year. The <br />monthly demand charge will remain constant throughout the fiscal year except as <br />provided for in subparagraph (d) below and shall be obtained by multiplying the <br />quantity of each billing parameter (for the average day of the peak month) by the <br />appropriate unit cost shown below. <br />BOD Pounds Per- Day -2.24 <br />99 Pounds Per- Day 4.71 <br />G6fineetion Eaeh 2.29 <br />Demand Charge - Effective Juty 1, 1996 Fiscal Year 1998-99 <br />Parameter Billing Unit Unit Cost Proposed Unit Cost <br />Flow Million Gallons Per Day $54,238.93 $59,120.00 <br />(mgd) <br />BOD Pounds Per Day 2.N 2.50 <br />SS Pounds Per Day 4.84 5.30 <br />Connection Each 2-46 2.60 <br />Loading charges shall be based on the discharge for the billing period. The loading <br />charge may vary from month to month and shall be obtained by multiplying the <br />quantity of each billing parameter (for the billing period) by the appropriate unit cost <br />8/ 12/98 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.