My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1998-081 to 085
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1998
>
Reso 1998-081 to 085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 5:27:49 PM
Creation date
7/14/2022 5:24:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/31/1998
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 PUBLIC WORKS <br />Chapter 5 Uniform Wastewater Discharge <br />Regulations <br />shown below. If a user's BOD and SS strengths are relatively constant, the City's <br />Public Works Services Director may establish a unit rate per volume of wastewater <br />discharged until such time that it has been determined that there has been a significant <br />change in the user's operation which would materially affect sewage flows and <br />strengths. <br />Loading Charge <br />Effeetive Ef€eetive Proposed <br />T.,i�-5 july 1, 1 Fiscal Year <br />Parameter Billing Unit i -e 1998-99 Unit Cost <br />Volume Million Gallons $268.79 $262.43 $286.00 <br />BOD Thousand Pounds 58.28 60.52 66.00 <br />SS Thousand Pounds i 0o.8S --4. 77 114.00 <br />(d) Estimate of Peak Month Parameters. Classification C user may, at their option, <br />submit an estimate of the peak month parameters for the ensuing fiscal year. The City <br />will use the peak month estimate for calculation of monthly demand charges for that <br />fiscal year. Should the estimated peak month use figures be exceeded, the user shall <br />be billed the demand unit costs multiplied by the new peak month discharge. This <br />amount shall be assessed retroactively to the beginning of the fiscal year. Each time a <br />higher peak month discharge occurs during the fiscal year, the above process will be <br />repeated. <br />(e) Sampling and Testing. User charges for sampling and testing shall include a Service <br />Charge and a Sampling Charge. Service Charges are designed to recover <br />administrative costs associated with the industrial billing and pretreatment program. <br />The monthly Service Charge will remain constant throughout the fiscal year and shall <br />be based on the number of routine samples to be conducted annually for each <br />connection as shown below. The Sampling Charge may vary from month to month <br />and shall be obtained by multiplying the number of each type of sample taken (and <br />tested) in each billing period by the appropriate unit cost shown on the following page. <br />8/12/98 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.