Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and RRM Design <br />for Memorial Park Improvements Exhibit A – Page 1 of 11 <br /> <br />EXHIBIT A <br />SCOPE OF SERVICES <br /> <br />Project Description <br /> <br />The City has a project to renovate Memorial Park. The project budget is $5M broken down as follows: <br />$850M for soft costs, $850M for owner’s contingency, and $3.3M for construction. This project is <br />grant funded and must go out to bid at the end of calendar year 2022, and after a contract is awarded <br />construction must be completed in 9 months. The materials specified for the new work must be <br />readily available so that work can meet this schedule. Public input on the park was solicited and <br />received in 2019, no further input is anticipated. The work is envisioned to include the following: <br />• Prefabricated restroom <br />• Accessible Play area for children 2-5 years of age <br />• Accessible Play area for children 5-12 years of age <br />• Picnic areas (1-2) with fabric shade structures <br />• Entry plaza <br />• Walkways <br />• Planting areas and reduced lawn including new irrigation <br />• Updated lighting for security (sufficient power assumed to be available) <br />• Parking lot pavement, signage, and striping replacement and addition of vehicular <br />control gates <br />• Prefabricated trash enclosure <br />• Replacement of the park’s 2 existing driveways along Callan Ave with up to 10’ <br />of connected damaged sidewalk replacement in either direction of the driveways <br />• Up to 15’ of damaged sidewalk replacement just south of the existing Bancroft <br />Ave driveway (existing driveway will remain as-is) <br /> <br />Scope of Work <br /> <br />This contract is for consulting services to prepare construction documents consisting of plans, <br />specifications, and estimates for renovation of the park through a public bid process. City will <br />contract separately with a contractor for construction of the improvements. Work shall generally be <br />in accordance with a conceptual plan prepared by Harris Design in 2019 except that no splash or water <br />play area is desired. No items shall be design build or designed by others except as specifically listed <br />below. <br /> <br />Task 1: PS&E Coordination and Meetings <br />CONSULTANT will prepare for and attend up to eight virtual or in-person Client <br />meetings. These meetings are intended to provide an opportunity for staff to preview and <br />provide input on the design progress, to address issues that may arise, and for general <br />coordination. These meetings will be scheduled as needed throughout the process. This <br />task also includes preparation, internal coordination, and preparation of meeting minutes. <br />CONSULTANT will utilize any surface utility information from the City-provided <br />DocuSign Envelope ID: 73B64E61-9591-470B-9CFE-9E9CD49407D4