My WebLink
|
Help
|
About
|
Sign Out
Home
CSA RRM Memorial Park CSA 07122022
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
CSA RRM Memorial Park CSA 07122022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 12:29:14 PM
Creation date
8/9/2022 12:29:03 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/12/2022
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and RRM Design <br />for Memorial Park Improvements Exhibit A – Page 5 of 11 <br /> <br />pressure, minimum embedment depth, resistance to lateral loads, friction coefficient, <br />and modulus of subgrade reaction. <br />b. Drilled piers for support of play structure and/or shade structures, including allowable <br />skin friction, minimum diameter and embedment depth, and resistance to lateral loads. <br />c. Anticipated total and differential settlements and discussion of liquefaction potential <br />(if applicable). <br />d. Provision of state-mapped 2019 CBC seismic design parameters (no site-specific <br />ground motion hazard analysis is included). <br />e. Site drainage. <br />f. Mitigation of stormwater runoff and discussion of the feasibility of bioretention areas <br />(using soil index testing to classify soil per USDA Hydrologic Soil Group), including <br />presentation of percolation test results. <br />g. Slab-on-grade and exterior flatwork recommendations; <br />h. Asphalt concrete pavement sections based on assumed traffic index values and R- <br />Value test results; <br />i. Recommendations for site preparation, earthwork, and fill compaction specifications; <br />and <br />j. Construction considerations and limitations; and <br />6. A brief discussion of the corrosion potential of near-surface soils encountered during our <br />subsurface investigation based on the laboratory corrosion screening test performed. <br />Consultant will convert the two 5-foot-deep borings into percolation test holes. Upon <br />completion of the percolation testing, the test holes will be backfilled with sand and the <br />upper approximately six inches will be patched with topsoil or patched with rapid setting <br />concrete. <br />Consultant shall provide a letter from a geotechnical engineer indicating that the design <br />is in accordance with the recommendations of the geotechnical report and that any <br />comments have been addressed. <br /> <br />Deliverables: <br />Geotechnical Report (Draft and Final) in pdf format. <br />Letter indicating compliance with recommendations. <br /> <br />Task 9: Arborist Report <br />Consultant will provide an arborists report containing a tree inventory, map, preservation <br />guidelines, and protection plan for all trees within the project limit that have a trunk <br />diameter of 6 inches or greater measured 54 inches above grade. <br /> <br />Deliverables: <br />Arborist Report <br /> <br />Details of Deliverables <br /> <br />DocuSign Envelope ID: 73B64E61-9591-470B-9CFE-9E9CD49407D4
The URL can be used to link to this page
Your browser does not support the video tag.