Consulting Services Agreement between City of San Leandro and RRM Design <br />for Memorial Park Improvements Exhibit A – Page 6 of 11 <br />Plans are envisioned to include the following: <br />Title and Reference Sheets <br />Title and reference sheets pursuant to City standards. <br />Demolition Plan <br />Demolition plans for structures and elements requiring removal to implement <br />the park design. The plans will locate, identify, and describe the removal and <br />provide instructions for disposal. Additionally, the plans will indicate items to <br />salvage or stockpile, such as topsoil, for later use in construction. <br />Erosion Control Plan <br />Erosion control plan for the proposed design that illustrates erosion <br />prevention, sediment control, and stormwater quality management during <br />construction to support the stormwater pollution prevention plan (SWPPP). <br />ADA Accessibility Plan <br />The plans will illustrate the dedicated accessible route, accessible signage, and <br />accessible parking for the project. <br />Horizontal Control Plans <br />The plans will establish all horizontal control for the park. The plans will also <br />identify construction layout control points and a coordinate system for locating <br />site elements. Note that the horizontal control plans are not included in the <br />50% PS&E submittal. <br />Site Utility Plans <br />Utility plans for water and storm drain begin at the upstream ends of each <br />utility within the project limits to the downstream connections at the existing <br />service mains, assumed to be directly adjacent to the project. Water and sewer <br />utilities are for a prefabricated restroom and the storm drain is for connecting <br />proposed storm drain and stormwater treatment measures to the existing <br />downstream storm drain system. This scope assumes that existing off-site <br />and/or on-site utility systems have adequate capacity and meters for the <br />proposed project – analysis of existing utilities’ capacities and design of any <br />improvements beyond the point of connection are not included in this scope. <br />This task assumes one proposed fire hydrant located near the existing parking <br />lot will suffice for Fire Code/Fire Department compliance – fire supply line is <br />assumed to be fed by existing on-site meter. Work shall include new water <br />service to the building and either a new sanitary sewer lateral or lining of the <br />existing sanitary sewer lateral. <br />DocuSign Envelope ID: 73B64E61-9591-470B-9CFE-9E9CD49407D4