My WebLink
|
Help
|
About
|
Sign Out
Home
10M Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 09062022
>
10M Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 4:27:28 PM
Creation date
9/26/2022 12:32:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/6/2022
Retention
PERM
Document Relationships
Reso 2022-140 CSA Environmental Science Assoc
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Identify alternative feasible regional sources of suitable beach sand/gravel (i.e., <br />compatible grain size distribution and sediment quality) in quantities sufficient for beach <br />nourishment <br /> <br />• For each alternative consultant shall develop a list of benefits, impacts, risks, and <br />concept-level engineering cost estimates to provide a basis for alternatives comparison <br /> <br />• Consultant shall prepare a qualitative discussion of each alternative's anticipated <br />resilience to sea-level rise, based on the SLR projections selected in task 4.6 <br /> <br />• Consultant shall collect photographs of similar constructed projects and will prepare <br />figures and renderings suitable for public presentation and to allow the public to visually <br />understand the changes to the existing conditions proposed under each alternative <br /> <br />• Consultant shall work with the City and TAG to apply the evaluation criteria (Task 4.6) to <br />evaluate the alternatives and select a preferred alternative that will be progressed <br />through conceptual design <br /> <br />• Preparation of the conceptual design (approximately 35%-completion level) will begin <br />following selection of the preferred alternative. Although this scope does not include <br />preparation of permit applications, consultant shall meet with the BRRIT to conduct a <br />preliminary review of the project. No follow-up with the BRRIT is assumed. <br /> <br />Consultant shall submit the following 35%-complete design package for review and comment: <br /> <br />• 35% design drawings including: project overview, grading plan, and illustrative cross- <br />sections <br /> <br />• Conceptual order of magnitude probable construction costs <br /> <br />• Conceptual Design Report that packages up all prior memos as appendices, describes <br />selection of the preferred alternative, and summarizes the design process <br /> <br />Task 5.1 Deliverables <br />• Draft and Final Conceptual Design Report in PDF format <br /> <br />• Design graphics for alternatives, including plan-view illustrations, cross sections, and <br />reference photos or graphical renderings illustrating the main features of each alternative <br /> <br />• Conceptual Design of Selected Alternative: <br /> 35% Drawings, including: Grading plan/Project Layout, cross sections, schematic details <br /> Conceptual order of magnitude probable construction costs <br /> <br />Task 5.1 Schedule <br />• 18 months from NTP
The URL can be used to link to this page
Your browser does not support the video tag.