My WebLink
|
Help
|
About
|
Sign Out
Home
10M Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 09062022
>
10M Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 4:27:28 PM
Creation date
9/26/2022 12:32:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/6/2022
Retention
PERM
Document Relationships
Reso 2022-140 CSA Environmental Science Assoc
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• Review background information and interpret historic photos and maps and complete an <br />initial “desktop” geomorphic assessment of the project site. <br /> <br />• Consultant shall review and leverage, to the extent practicable, an assortment of existing <br />studies and prior work that has been completed at the site, including the Marsh Manual <br />(ESA 2007) and Long Beach Levee Breach Ecological Evaluation (Wood Biological <br />Consulting 2020), as well as regional planning guidance documents, including the New <br />Life for Eroding Shorelines report (SFEI & Baye 2019), the Baylands Ecosystem Habitat <br />Goals (Goals Project 1999, 2010, and 2015), and the San Francisco Bay Shoreline <br />Adaptation Atlas (SFEI 2019). <br /> <br />• Consultant shall synthesize the existence studies and information in a brief memo to <br />raise additional questions and highlight potential data gaps. <br /> <br />• Consultant shall carefully consider what data gaps exist and propose how to fill those <br />gaps. Consultant shall coordinate with the city to discuss the implications of the identified <br />gaps on the ability to complete the current proposed project and future phases. <br /> <br />Task 4.1 Deliverables <br />• Memo summarizing review of background information and synthesizes prior studies and historical <br />maps and photos, in PDF format. <br />• Memo summarizing identified data gaps (if required) in PDF format <br />Task 4.1 Schedule <br />• Memo report: Six weeks from Notice to Proceed (NTP) <br /> <br />Task 4.2 Topographic and Bathymetric Surveys <br />Consultant shall prepare a field data collection plan shortly after the review of the background data and <br />initial site reconnaissance. The field data collection plan shall be circulated for review by the City and TAG. <br />Consultant may survey the project area using a combination of the following three methods: <br />• Bathymetric data from a boat during high tide with an echosounder <br />• Topographic data using drone during low tide (structure-from-motion, photogrammetry, LiDAR, or <br />similar methods of comparable accuracy and quality) <br />• Targeted ground survey during low tide to verify and augment both the bathymetric and drone <br />survey. <br />Task 4.2 Deliverables <br />• Proposed survey plan in PDF format <br />• A brief technical memorandum describing the survey data collection methods, dates of data <br />collection, survey control, and graphics showing the spatial extents of the collected data.
The URL can be used to link to this page
Your browser does not support the video tag.