Laserfiche WebLink
Exibit B -Compensation <br />Weekly Pric e Annual Total Area Descri ption of Areas -Street Special Instructions <br />location <br />Mow: $169 .00 $7,098.00 <br />$21.00 $441 .00 <br />Edge, Grass clippings & Debris to be <br />Edge/Blow: San Lt:Jand ro Ball picked up from the Ball Fields. This <br />$24.00 $48.00 Park* <br />Teagarden Street facility requires edging twice per Weeds: month February through October <br />Aeration: _$250.00 $1,000 (once/month at other times). <br />Fe rti lization: $160.00 $640.00 <br />Ins ide and outside of facility. Edge, <br />Mow: $49.00 2,058.00 Gras s c lippings & Debris to be picked <br />up (NO T blown into pool or onto pool <br />Edge/Blow: $10.00 $210.00 San Leandro decking). Th is facility needs to be <br />Family Aquatic Zelma Street edged twice per month during the <br />Aeration: $25.00 $ 75.00 Center open season (approximate ly 16 <br />Fertiliza tion: $25.00 $75.00 <br />weeks); once per month at other <br />-times. During open season, work at <br />this facility needs to be completed by <br />9AM. <br />Mow: $71.00 $2,982.00 <br />Edge/Blow: $12.00 $252.00 <br />Siempre Verde San Leandro Boulevard/Pork Street <br />Aeration $ 69 .00 _$ 207.00 Park <br />Fertilization: -$69.00 _$207.00 <br />Mow: $237.00 $9 ,954.00 <br />Edge/B low: $28.00 $588.00 <br />Edge, Grass clippings & Debris to be <br />picked up from the Ba ll Fields. Th is <br />$48.00 $96.00 Stenzel Park* Wicks Bl facility requires edging twice per Weeds: month February through October <br />Aeration: $248.00 _$992.00 (once/month at other times). <br />Fertilization: $248.00 $992.00