My WebLink
|
Help
|
About
|
Sign Out
Home
10P Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 09062022
>
10P Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 4:29:14 PM
Creation date
9/26/2022 12:32:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/6/2022
Retention
PERM
Document Relationships
Reso 2022-143 NPSA Rubicon Amendment No. 6
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exibit B -Compensation <br />Weekly Pric e Annual Total Area Descri ption of Areas -Street Special Instructions <br />location <br />Mow: $169 .00 $7,098.00 <br />$21.00 $441 .00 <br />Edge, Grass clippings & Debris to be <br />Edge/Blow: San Lt:Jand ro Ball picked up from the Ball Fields. This <br />$24.00 $48.00 Park* <br />Teagarden Street facility requires edging twice per Weeds: month February through October <br />Aeration: _$250.00 $1,000 (once/month at other times). <br />Fe rti lization: $160.00 $640.00 <br />Ins ide and outside of facility. Edge, <br />Mow: $49.00 2,058.00 Gras s c lippings & Debris to be picked <br />up (NO T blown into pool or onto pool <br />Edge/Blow: $10.00 $210.00 San Leandro decking). Th is facility needs to be <br />Family Aquatic Zelma Street edged twice per month during the <br />Aeration: $25.00 $ 75.00 Center open season (approximate ly 16 <br />Fertiliza tion: $25.00 $75.00 <br />weeks); once per month at other <br />-times. During open season, work at <br />this facility needs to be completed by <br />9AM. <br />Mow: $71.00 $2,982.00 <br />Edge/Blow: $12.00 $252.00 <br />Siempre Verde San Leandro Boulevard/Pork Street <br />Aeration $ 69 .00 _$ 207.00 Park <br />Fertilization: -$69.00 _$207.00 <br />Mow: $237.00 $9 ,954.00 <br />Edge/B low: $28.00 $588.00 <br />Edge, Grass clippings & Debris to be <br />picked up from the Ba ll Fields. Th is <br />$48.00 $96.00 Stenzel Park* Wicks Bl facility requires edging twice per Weeds: month February through October <br />Aeration: $248.00 _$992.00 (once/month at other times). <br />Fertilization: $248.00 $992.00
The URL can be used to link to this page
Your browser does not support the video tag.