My WebLink
|
Help
|
About
|
Sign Out
Home
10B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 10032022
>
10B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 9:07:39 AM
Creation date
10/10/2022 9:26:18 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
10/3/2022
Retention
PERM
Document Relationships
Reso 2022-166 Bear Electrical Solutions, Inc. Contract
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 22-500 <br />the original contract amount. While this level of cumulative change orders is relatively high, this will <br />help to ensure efficient completion of the project on budget and on schedule. <br />The low bid is 49.2% higher than the engineer’s estimate and additional funding is necessary to <br />fund this project’s construction with suitable contingency. A challenging bidding climate , as well as <br />significant economic inflation , contributed to this larger than expected bid. Three responsive bids <br />were received and re-bidding the project is not expected to result in a lower cost. <br />Staff recommends that $145 ,000.00 in unused funds in the Vehicle Registration Fee funding from <br />the Street Overlay / Rehabilitation 2017-18 project in account 143-38-392 be appropriated to the <br />Adaptive Traffic Signal - Marina Boulevard project. Work on the Overlay / Rehabilitation project <br />2017-18 is complete and these funds are no longer needed for that project . <br />Current Agency Policies <br />·Maintain and enhance San Leandro’s infrastructure <br />Applicable General Plan Policies <br />·Policy T-2.4 Connectivity. Ensure that the design of streets and other transportation <br />features helps to better connect the city’s circulation network and facilitate safer and more <br />convenient travel between San Leandro and surrounding communities <br />·Policy T-5.4 Traffic Flow Improvements. Use a variety of technology-driven measures to <br />improve traffic flow at congested intersections <br />·Policy T-5.7 Technology and Roadway Efficiency. Use technology, including smartphone <br />applications, roadway sensors, and real time data on congestion, travel time, and parking <br />supply to create a more efficient transportation system, and to maximize the benefits of the <br />existing road system before investing in its expansion <br />Previous Actions <br />·On July 20th, 2020, by Resolution No. 2020-91, the City Council approved amendment 1 <br />for the existing Consultant Services Agreements with DKS Associates, Fehr and Peers, <br />and W-Trans for on-call transportation engineering services. Fehr and Peers design <br />consulting work for this project was performed under this agreement . <br />·On March 2, 2020, by Resolution No. 2020-023 the City Council authorized the City <br />Manager to negotiate and execute Amendment 1 to the 1995 Agreement for Maintenance <br />of State Highways in the City of San Leandro and the Freeway Maintenance Agreement <br />(04-ALA 880 PM 22.6/24) both of which are between the State of California (Caltrans) and <br />the City of San Leandro. The purpose of the agreement is to provide for distribution of <br />maintenance costs with Caltrans, including adaptive signal improvements . <br />Permits and/or Variances Granted <br />An encroachment permit was obtained from the California Department of Transportation for the <br />fiber optic and traffic signal improvements within Caltrans right of way . <br />Page 3 City of San Leandro Printed on 9/28/2022
The URL can be used to link to this page
Your browser does not support the video tag.