My WebLink
|
Help
|
About
|
Sign Out
Home
Vacation - Portion of Alvarado St, Caterpillar Tractor - File 770 pt1
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
Vacations
>
Vacation - Portion of Alvarado St, Caterpillar Tractor - File 770 pt1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 9:38:37 AM
Creation date
10/11/2022 4:48:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Recorded Document Type
Vacation
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
b. c. R. H. Ward <br />L. E. Riordan <br />November 3, 1971 <br />Caterpillar Tractor Co. <br />100 Northeast Adams Street <br />Peoria, Illinois 61602 <br />Attention: Mr. Ronald Crowell <br />Supervising Engineer <br />Design & Construction Division <br />Dear Mr. Crowell: <br />Enclosed is a copy of the proposed ordinance for vacating a portion of <br />Alvarado Street. This ordinance cannot be adopted until the cost -sharing <br />agreement between the City and Caterpillar Tractor Co. is executed. <br />Copies of the proposed agreement and letter of intent are returned here- <br />with for certain changes needed to satisfy the City, none of which seems <br />to substantially affect our original intentions. They are as follows: <br />Letter of Intent: <br />Since the City cannot agree in advance of a public hearing and <br />legislative action to vacate a public street, we can agree only <br />to undertake those proceedings necessary for such vacation. <br />Cost -Sharing Agreement* <br />Para�raph_l. Again, we agree to "undertake" action. Since gas <br />and water lines are still in Alvarado Street and will be for an <br />indefinite time, the rights of Pacific Gas and Electric Company <br />and the East Bay Municipal Utility District must be added. <br />Para�ra�h 2. Include an additional item after Item (d), <br />"(e) Adjustment, repair or rehabilitation of railroad spur <br />crossing." The last item will be changed to "(f)." <br />Paragraphs 5 _and_S. Engineering costs are expected to run between <br />10% and 15%; therefore, as agreed in your telephone conversation <br />with our Director of Public Works, please change these figures to <br />12% and 112% respectively. <br />
The URL can be used to link to this page
Your browser does not support the video tag.