My WebLink
|
Help
|
About
|
Sign Out
Home
10c Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 11212022
>
10c Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 2:29:11 PM
Creation date
11/22/2022 11:28:27 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/21/2022
Retention
PERM
Document Relationships
Reso 2022-199 Brightly FCA and Capital Predictor Software
(Amended)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.Detailed data collection of individual equipment items will be captured to build an equipment inventory <br />which will be imported into Company's work & asset management solution as defined in the Asset <br />Inventory and System/Component table below. <br />2.A condition assessment of major building systems, including HVAC, Electrical, Plumbing, Roofing, Site <br />Paving, Vertical Transportation, Structural and Building Envelope to be imported into Company's capital <br />forecasting/prediction solution as defined in the Asset Inventory and System/Component table below. <br />1.HVAC equipment items only will also be tracked in the capital forecast or prediction solution as specific <br />Sub-Systems.For these items, Make/Model/Serial Number will be captured and tracked in the <br />Equipment Inventory, and the item will also be included as a Sub-System. <br />2.All other major Systems will be collected at the Systems Level in Company's capital forecasting solution <br />as a general Sub-Systems. <br />Asset Inventory and Systems/Component Table <br />The following table defines the standard SOW that will be followed to capture the equipment data used to build <br />the Equipment Inventory, which will be imported into the Work & Asset Management Solution as well as <br />the System-Sub-System data used to build the Capital Reserve Table that will be imported into the capital <br />forecasting or prediction solution. <br />Table Column Header Descriptions <br />Individual or System Level Capture <br />•Individual = Item will be collected individually <br />•System = Item will be grouped by system or sub-system, location will correspond to the associated <br />building structure <br />Item Represented in Capital Forecasting or Prediction solution? Y/N <br />•No = Cost information related to individually captured items will be provided at a system or sub-system <br />level only in capital forecasting or prediction solution <br />Included in Equipment Inventory? Y/N <br />•No = Item will not be setup in the work & asset management solution <br />*Items captured as a system will be setup as a single equipment inventory item so that work can be <br />tracked against it. <br />Sub-System <br />Individual <br />or System <br />Level <br />Capture <br />Item Represented <br />in Capital <br />Forecasting? (Y/N) <br />Included in <br />Equipment <br />Inventory? (Y/ <br />N) <br />Comments <br />Exterior Systems <br />10
The URL can be used to link to this page
Your browser does not support the video tag.