Laserfiche WebLink
issuance. These fees are subject to change on July 1 of each year and are not vested until <br />Building Permit issuance. <br />47. The Development Fee for Street Improvement (DFSI) shall be assessed in the amount of <br />$262,446.98 which is calculated at $1,532.64 per residential unit and $4.76 per square foot <br />of retail space. A credit for the existing use of the property has been applied to this fee, in <br />the amount of $176,085.66, which is calculated at $2.55 per square foot of the existing <br />20,378 square foot building for the personal services use, and $4.76 per square foot of the <br />existing 26,076 square foot building for the previous retail use. These fees were calculated <br />using the Fiscal Year 2020-21 fee rates and are due at Building Permit issuance. These <br />fees are subject to change on July 1 of each year and are not vested until Building Permit <br />issuance. <br />VI. ALAMEDA COUNTY FIRE DEPARTMENT REQUIREMENTS <br />48. A formal plan check review will be completed at time of building permit submittal. The <br />building will need to comply with all building and fire code requirements in affect at time of <br />building permit submittal. <br />49. The building shall comply with all Building and Fire Codes requirements for building size, <br />height, exiting, and protection of shafts and corridors. <br />50. The proper building construction type shall be indicated on the cover sheet: Type IA or B. <br />51. A "Deferred Submittal" heading on the cover sheet for the Fire Sprinkler system shall be <br />provided. <br />52. A "Deferred Submittal" heading on the cover sheet for the Life Safety Fire Alarm system <br />shall be provided. <br />53. A "Deferred Submittal" heading on the cover sheet for the Underground Fire Line shall be <br />provided. <br />54. A "Deferred Submittal' heading on the cover sheet maybe required for a Fire Pump. <br />55. A Deferred Submittal shall be provided for the puzzle/stacker/lift parking system. <br />56. A Deferred Submittal of Carbon Dioxide system may be required for the parking garages. <br />57. A Deferred Submittal may be required for a generator for the mechanical ventilation based <br />on the Carbon Dioxide system in the garage. <br />58. Water flow data shall be provided at the time of building submittals to ensure the building <br />can actually be built per Appendix B of the 2019 California Fire Code. This shall be provided <br />every 6 months during the construction phase. <br />59. Fire extinguishers with a rating of 2A 10:C shall be provided in the corridor with a maximum <br />travel distance of 75 feet. <br />60. Elevator information will need to be provided indicating whether the cars are propelled by <br />electric, beltdrive, or hydraulic fluid power. <br />PLN 18-0036 <br />