My WebLink
|
Help
|
About
|
Sign Out
Home
12a Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 12052022
>
12a Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 3:26:34 PM
Creation date
12/15/2022 4:15:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/5/2022
Retention
PERM
Document Relationships
Ord 2022-014 Building Code Update
(Amended)
Path:
\City Clerk\City Council\Ordinances\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
described in the construction documents maintain the weather resistance of the exterior <br />wall envelope. The supporting documentation shall fully describe the exterior wall system <br />which was tested, where applicable, as well as the test procedure used. <br />107.2 Site plan. <br />The construction documents submitted with the application for permit shall be <br />accompanied by a site plan showing to scale the size and location of new construction and <br />existing structures on the site, distances from lot lines, the established street grades and <br />the proposed finished grades and, as applicable, flood hazard areas, floodways, and design <br />flood elevations; and it shall be drawn in accordance with an accurate boundary line <br />survey. In the case of demolition, the site plan shall show construction to be demolished <br />and the location and size of existing structures and construction that are to remain on the <br />site or plot. The Building Official is authorized to waive or modify the requirement for a <br />site plan when the application for permit is for alteration or repair or when otherwise <br />warranted. <br />107.3 Examination of documents. <br />The Building Official shall examine or cause to be examined the accompanying <br />construction documents and shall ascertain by such examinations whether the <br />construction indicated and described is in accordance with the requirements of this Code <br />and other pertinent laws or ordinances. <br />107.3.1 Approval of construction documents. <br />When the Building Official issues a permit, the construction documents shall be marked, in <br />writing or by stamp, with “REVIEWED FOR CODE COMPLIANCE.” These are the official <br />plans reviewed by the City of San Leandro for building permit purposes. They are required <br />to be on the job, available to the Building Official or duly authorized representative at all <br />times. One set of construction documents so reviewed shall be retained by the Building <br />Official. <br />107.3.2 Previous approvals. <br />This Code shall not require changes in the construction documents, construction or <br />designated occupancy of a structure for which a lawful permit has been heretofore issued <br />or otherwise lawfully authorized, and the construction of which has been pursued in good <br />faith within 180 days after the effective date of this Code and has not been abandoned. <br />107.3.3 Phased approval. <br />The Building Official is authorized to issue a permit for the construction of foundations or <br />any other part of a building or structure before the construction documents for the whole
The URL can be used to link to this page
Your browser does not support the video tag.