My WebLink
|
Help
|
About
|
Sign Out
Home
12a Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 12052022
>
12a Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 3:26:34 PM
Creation date
12/15/2022 4:15:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/5/2022
Retention
PERM
Document Relationships
Ord 2022-014 Building Code Update
(Amended)
Path:
\City Clerk\City Council\Ordinances\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
building or structure have been submitted, provided that adequate information and <br />detailed statements have been filed complying with pertinent requirements of this Code. <br />The holder of such permit for the foundation or other parts of a building or structure shall <br />proceed at the holder’s own risk with the building operation and without assurance that a <br />permit for the entire structure will be granted. <br />107.3.4 Design professional in responsible charge. <br />107.3.4.1 General. <br />When it is required that documents be prepared by a registered design professional, the <br />Building Official shall be authorized to require the owner to engage and designate on the <br />building permit application a registered design professional who shall act as the registered <br />design professional in responsible charge. If the circumstances require, the owner shall <br />designate a substitute registered design professional in responsible charge who shall <br />perform the duties required of the original registered design professional in responsible <br />charge. The Building Official shall be notified in writing by the owner if the registered <br />design professional in responsible charge is changed or is unable to continue to perform <br />the duties. <br />The registered design professional in responsible charge shall be responsible for reviewing <br />and coordinating submittal documents prepared by others, including phased and deferred <br />submittal items, for compatibility with the design of the building. <br />Where structural observation is required by Section 1704, the statement of special <br />inspections shall name the individual or firms who are to perform structural observation <br />and describe the stages of construction at which structural observation is to occur (see <br />also duties specified in Section 1705). <br />107.3.4.2 Deferred submittals. <br />For the purposes of this section, deferred submittals are defined as those portions of the <br />design that are not submitted at the time of the application and that are to be submitted <br />to the Building Official within a specified period. <br />Deferral of any submittal items shall have the prior approval of the Building Official. The <br />registered design professional in responsible charge shall list the deferred submittals on <br />the construction documents for review by the Building Official. <br />Documents for deferred submittal items shall be submitted to the registered design <br />professional in responsible charge who shall review them and forward them to the <br />Building Official with a notation indicating that the deferred submittal documents have <br />been reviewed and been found to be in general conformance to the design of the building.
The URL can be used to link to this page
Your browser does not support the video tag.