Laserfiche WebLink
Execution Version <br />Exhibit B - 1 <br />EXHIBIT B <br />MAINTENANCE AND OPERATIONS PLAN <br />As a public agency, EBCE will issue a competitive solicitation for the development of the proposed <br />Charging Stations. This solicitation may call for final design, engineering, permitting, and construction <br />services, but also for maintenance and operation services (“M&O”) and back-office services to be provided <br />by a to-be-determined contractor (“Contractor”). <br />EBCE has incorporated industry best practices into this preliminary Exhibit B (the “Draft M&O Plan”). <br />EBCE will update this Draft M&O Plan, in its sole discretion once a Contractor has been selected and <br />such Contractor provides a “Final M&O Plan”. Modification of Exhibit B will be completed at the staff level <br />and it is anticipated that modification of Exhibit B will not require City Council review or approval. <br />OPERATIONS & MAINTENANCE <br />Term and Warranty: <br />● Equipment maintenance services for five (5) years commencing on the systems’ commercial <br />operation date, with sub-sequential one-year extensions at EBCE’s option; and, <br />● All equipment, hardware, and software shall include a minimum five (5) year manufacturer's <br />warranty for parts and labor. <br />Operating Costs: <br />● As the project owner, EBCE will be responsible for the payment of operating costs, including any <br />royalties, licenses, fees, and/or taxes payable due to the operation of the Charging Stations. This <br />responsibility includes all costs incurred between the Effective Date through expiration of the Term <br />or renewed Term. <br />● As the load-serving entity for the Charging Stations, EBCE will manage power supply for the <br />Charging Station equipment. This responsibility spans from the Effective Date through expiration <br />of the Term or renewed Term. <br />Installation, Material and Electrical Equipment: <br />● As the project owner, EBCE will be responsible for the payment of installation costs, including any <br />royalties, licenses, fees, and/or taxes payable due to the operation of the Charging Stations and <br />its related equipment and signage. This responsibility includes all costs incurred between from the <br />Effective Date through expiration of the Term or renewed Term. <br />● Project design and hardware shall be tamper-proof and vandalism-proof, such as tamper-resistant <br />screws, anti-vandalism hardware, and locked enclosures. <br />● Cable management system is required to keep the charging cables off the ground. <br />● All equipment shall be installed in protected areas to prevent it from being damaged by vehicles. <br />Physical barriers such as bollards, parking stops, and fences shall be installed to any equipment <br />exposed to physical damage or unsafe conditions. All conduits and wiring shall be installed <br />following building codes, industry and safety standards and best practices. <br />● If the Charging Stations do not have built in credit card readers, a credit card payment solution <br />(i.e., kiosk) must be installed that complies with SB454 requirements. <br />Hardware and EV Service Equipment: <br />● EV service equipment (“EVSE”) shall comply with NEMA 3R for indoor or outdoor use. <br />● EVSE must be approved by a Nationally Recognized Testing Laboratory program for EVSE <br />testing and certification. <br />● EVSE system must include a turnkey communications network installation that includes but is not <br />limited to all hardware, software, carrier services and coordination, professional services, 3rd party <br />coordination, technical assistance, maintenance, as well as any other product or service required <br />for a secure and industrial/government regulation compliant solution necessary to ensure reliable <br />network connectivity to/from the required system components and applications for users of the <br />system. <br />DocuSign Envelope ID: 9A9D2499-76B9-48B0-8ECE-EF852438F252DocuSign Envelope ID: EC3D6FF2-1EAC-45AF-8666-F6EEFB410D6F