My WebLink
|
Help
|
About
|
Sign Out
Home
Consulting Services Agreement NBS Fee Study.docx
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2022
>
Consulting Services Agreement NBS Fee Study.docx
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 12:05:06 PM
Creation date
12/18/2022 11:44:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised November 8, 2022 <br />NBS for Cost Allocation Plan, Comprehensive User Fee Study, & Development Impact Fee Study Exhibit A – Page 2 of 9 <br /> A summary schedule of the total annual allocated costs to each fund and budget <br />unit. <br /> A schedule of indirect cost rates for each department/division and Citywide overall. <br />After a meeting with City staff to review the draft of outcomes, we will utilize staff’s feedback to <br />make a round of revisions to the draft plan results. We are available to assist the Finance <br />Department in presenting the draft Plan to selected City staff and address any comments or <br />concerns regarding methods of cost allocation or cost allocation outcomes. <br />TASK 2.3: FINAL DOCUMENTATION <br />The Final Report for the Plan includes an Executive Summary, illustration of analytical methods, <br />presentation of findings, narrative descriptions complying with the standards of Title 2 CFR Part <br />200, and a technical appendix showing the analysis and any relevant data sources. We will <br />submit the draft Final Report to City management, collect input, and make a round of revisions <br />to the draft report to ensure the City is satisfied with the complete deliverable. <br />At the conclusion of the project, we will provide an electronic copy of the full detailed Cost <br />Allocation Plan model in PDF format, as well as the schedule of summarized cost allocation <br />outcomes in Excel. <br />Task 3: User Fee Study <br />We understand the scope of this review is to include all fees as listed in the City’s Master Fee <br />Schedule effective July 2022-23. According to the Table of Contents of the Master Fee <br />Schedule, we will be working with the following departments and divisions to review their fee <br />programs: <br /> General Administrative fees charged by City Clerk, City Manager, and Finance <br /> Community Development fees charged by Building, Code Enforcement, Economic <br />Development, and Planning <br /> Engineering, and Transportation <br /> Fire Service-Related fees, excluding fees set by the Alameda County Fire <br />Department <br /> Library <br /> Police <br /> Public Works <br /> Recreation <br /> Human Services <br />In general, the scope of services includes all fees for service that can be reasonably analyzed <br />on a time per activity basis. The following types of charges are generally excluded because they <br />are subject to different laws and requirements than the bulk of the user and regulatory fees <br />under review: <br /> Penalties and fines – per Article XIIC of the California Constitution, these types of <br />charges do not require a cost-of-service analysis to substantiate. <br /> Equipment and facility rentals - per Article XIIC of the California Constitution, these <br />types of charges do not require a cost-of-service analysis to substantiate. San <br />Leandro as a Charter City can set these fees based on a comparison of available <br />DocuSign Envelope ID: 7A84F803-3528-4F56-945D-63F8DD36D0C6
The URL can be used to link to this page
Your browser does not support the video tag.