Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised 11/21/2022 Terraphase Engineering, Inc for Soil Risk Analysis Exhibit A – Page 2 of 3 <br />As part of Task 2, Consultant will: <br />• Review existing site environmental and geotechnical data on the stockpiled soil and former <br />polishing pond sludge. <br />• Evaluate whether additional characterization of the soil stockpile and former polishing pond sludge <br />is required. <br />• Review construction details for the former polishing pond. <br />• Review groundwater data from monitoring wells adjacent to the pond. <br />• Evaluate the feasibility and potential risk to the environment of the following actions: <br />o Action 1: Leaving the sludge in its current location. <br />o Action 2: Moving the stockpile into the polishing pond without any pre-treatment. <br />• Evaluate options for reducing potential risk of Actions 1 and 2. <br />• Evaluate the potential risk or impact of placing stockpile soil (with or without solidification/cement stabilization) to the proposed future use of the pond as a treatment wetland area, as follows: <br />­ Evaluate potential leaching of constituents from stockpile soil and sludge to <br />groundwater. <br />­ Screen laboratory data against appropriate and relevant regulatory screening criteria. <br />­ Review of constituents that may affect reuse or disposal options. <br />• Evaluate past and current regulatory requirements for management of soil/sludge at sites such as the <br />WPCP. <br /> <br />Task 2 Deliverable <br /> Consultant will prepare a Technical Memorandum (Tech Memo) summarizing the results of the <br />evaluation. The Tech Memo will include a discussion of regulatory requirements, risks associated with <br />the various potential actions, and recommendations. Consultant will prepare and submit a draft Tech <br />Memo for review by City personnel. Consultant will make revisions based on the City’s comments and <br />will issue a final Tech Memo. <br />Task 2 Delivery Date <br />The draft Tech Memo will be completed 6 weeks after authorization/notice to proceed. Completion of the final Tech Memo will be contingent on the receipt of all City comments and the extent and nature of City comments. <br /> <br />(Optional) Task 3 – Sludge Measurement and Geotechnical Evaluation <br />If the evaluation performed under Task 2 shows that the potential placement on and/or mixing of stockpile <br />soil with the pond sludge is feasible, Consultant will measure the depth of the former polishing pond <br />DocuSign Envelope ID: B65CF6DA-BB07-4010-88DC-BDA1A7ACF5A8