My WebLink
|
Help
|
About
|
Sign Out
Home
Terraphase Soil Analysis CSA Update 2022 11 21.pdf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
Terraphase Soil Analysis CSA Update 2022 11 21.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 11:54:37 AM
Creation date
1/3/2023 9:02:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised 11/21/2022 Terraphase Engineering, Inc for Soil Risk Analysis Exhibit A – Page 3 of 3 <br />sludge at several locations, estimate the quantity present, and determine the ratio of total volume sludge <br />to total volume stockpiled soil. <br />Consultant will also evaluate data with respect to geotechnical considerations related to the placement, moving, and mixing of various materials. Consultant will perform a geotechnical evaluation with respect to <br />the capacity of the sludge and stockpiled soil to support future fill when soil is placed over sludge and <br />when mixed together. If necessary, Consultant will discuss potential options for improving the <br />geotechnical properties of the mixture of sludge and stockpiled soil and provide recommendations for <br />bench-scale testing of the properties of sludge/stockpile mixtures. <br /> Task 3 Deliverable Consultant will revise and finalize the Tech Memo to include the findings of the Task 3 evaluations. Task 3 Delivery Date <br />4 weeks after receipt of written notification to proceed with Task 3. <br /> <br />DocuSign Envelope ID: B65CF6DA-BB07-4010-88DC-BDA1A7ACF5A8
The URL can be used to link to this page
Your browser does not support the video tag.