Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised 11/21/2022 Terraphase Engineering, Inc for Soil Risk Analysis Exhibit B – Page 1 of 2 <br />EXHIBIT B COMPENSATION SCHEDULE & REIMBURSABLE EXPENSES Task 1 Project Management and Meetings $19,955 Task 2 Soil Stockpile and Sludge Data Evaluation $14,757 <br />Task 3 (optional) Sludge Measurement and Geotechnical Evaluation $3,492 Total for all tasks not to exceed: $38,204 The proposal scope of work and fee assumes the following: <br />• Analytical laboratory data from the 2021 treatability study performed by Leland will be made available <br />to Terraphase in an electronic database deliverable (EDD) format. Additional effort may be needed if <br />the data must be hand-entered in a database. <br />• Field work related to the measurement of sludge thickness in the pond will be completed during one <br />mobilization. <br />• The geotechnical evaluation will be conducted using existing geotechnical data. The collection and <br />analysis of additional samples is not included in this proposal. <br /> <br /> <br />Category <br /> <br />Units <br /> 2022 Standard <br />Rate <br /> <br />Discount <br /> <br />Rate <br />Labor <br />Principal hour $ 264.00 10% $ 237.60 <br />Senior Associate hour $ 244.00 10% $ 219.60 <br />Associate hour $ 224.00 10% $ 201.60 <br />Senior Project hour $ 211.00 10% $ 189.90 <br />Project hour $ 198.00 10% $ 178.20 <br />Senior Staff hour $ 179.00 10% $ 161.10 <br />Staff II hour $ 151.00 10% $ 135.90 <br />Staff I hour $ 124.00 10% $ 111.60 <br />Technician II hour $ 121.00 10% $ 108.90 <br />Technician I hour $ 84.00 10% $ 75.60 <br />GIS Technician II hour $ 110.00 10% $ 99.00 <br />GIS Technician I hour $ 89.00 10% $ 80.10 <br />Administrator hour $ 89.00 10% $ 80.10 <br /> <br />DocuSign Envelope ID: B65CF6DA-BB07-4010-88DC-BDA1A7ACF5A8