Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised 12/20/2022 <br />TAIT & Associates, Inc. for PWSC Replace Fuel Tanks Exhibit A – Page 6 of 6 <br /> <br />Information provided by City: <br />• Construction management and inspections <br /> <br />TASK G - ADDITIONAL SERVICES THAT MAY BE REQUIRED <br />Optional services, if any, may be included as separate line items in the cost <br />proposal. The selected consultant(s) may be required to provide additional <br />services at the discretion of the City. A contract change order will be negotiated <br />at the time it is determined by the City that any additional services are required. <br /> <br />SCHEDULE: <br />Note: All below dates are the working days (assume 20 days per month) to be projected <br />from receipt of City Notice to Proceed. <br /> <br />Cumulative project duration of 130 working days: <br />• Preliminary Design / Research, 10 days <br />• Perform Field Survey Work, 25 days <br />• Prepare 60% Design Package, 45 days <br />• Initial City Review, 55 days <br />• Revise and Prepare 100% package, 70 days <br />• 100% Submittal and Finalize Permits, 115 days <br />• Final Design Package, 120 days <br />• Issue Plans for Bid/Construction, 130 days <br />• Construction Support Services – based on bid and contract award timing <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: AC9B155F-9536-448C-B444-C75E23C754D7