My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA - Newton Manor Tennis Court Resurfacing.pdf
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2023
>
NPSA - Newton Manor Tennis Court Resurfacing.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 11:54:22 AM
Creation date
2/16/2023 2:49:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />Non-Professional Services Agreement between January 3, 2023 <br />City of San Leandro and Newton Construction & Management, Inc.—Exhibit A Page 4 of 5 <br />2. Immediately contain and prevent leaks and spills from entering the storm drain system, and <br />properly clean up and dispose of the waste and clean up materials. <br />3. Not wash any spilled material into the streets, gutters, storm drains, or creeks. <br />STORM WATER BEST MANAGEMENT PRACTICES: To eliminate storm water pollution, the Contractor <br />shall implement effective control measures at construction sites. BMPs include schedules of activities, <br />prohibition of practices, general good housekeeping practices, operational practices, pollution prevention <br />practices, maintenance procedures, and other management procedures to prevent the discharge of <br />pollutants directly or indirectly to the storm drain system. <br />• The Contractor shall implement all applicable BMPs including but not limited to the following: <br />• All construction materials shall be stored at least ten feet away from inlets, catch basins, and curb <br />returns. <br />• Store materials that have the potential to be transported to the storm drain system, by storm <br />runoff or by a spill, under cover in a contained area or in sealed waterproof containers. <br />• During wet weather or when rain is in forecast, store materials that can contaminate rainwater or <br />be transported by storm water or other runoff to the storm drain system inside a building or cover <br />them with a tarp or other waterproof material secured with weights to prevent contact with rain <br />• Use tarps on the ground to collect fallen debris or splatters that could contribute to storm water <br />pollution. <br />• Pick up litter, construction debris, and other wastes daily from outside areas including the <br />sidewalk area, gutter, street pavement, and storm drains impacted by the project; all wastes shall <br />be stored in covered containers or disposed of or recycled immediately. <br />• Inspect vehicles and equipment arriving on-site for leaking fluids, and promptly repair leaking <br />vehicles and equipment; use drip pans to catch leaks until repairs are made. <br />• Avoid spills by handling materials carefully <br />• Storage and disposal of all hazardous materials such as paints, thinners, solvents, and fuel; and <br />all hazardous wastes such as waste oil must meet all federal, state, and local standards and <br />requirements. <br />• For guidance on selecting and implementing effective control measures the Contractor is directed <br />to California Stormwater Quality Association (CASQA) at: http://www.casqa.org. <br />STORAGE OF EQUIPMENT AND MATERIALS: The Contractor shall secure, as necessary, for use <br />during the duration of the project, property for equipment storage, stockpiling materials and other <br />construction related activities as needed. The Contractor shall submit a letter indicating the staging area <br />location, the property owner’s name, address, and phone number, and the owner’s signed consent for the <br />use of the property for the duration of the project. No storage will be permitted on private property within <br />the City of San Leandro unless a Use Permit indicating proper zoning has been obtained from the City’s <br />Community Development Department, Planning Division. <br />Unless a staging area is described on the plans or in the specifications, construction materials and <br />equipment shall not be stored in streets, roads, highways, or on public property except during its actual <br />use on the work. Any staging area provided by the City is provided as-is without warranty that it is <br />adequate or suitable for Contractor’s operations. Contractor shall evaluate the staging area provided and <br />secure any additional staging area needed. <br />TRAFFIC CONTROL AND ACCESS: Contractor shall not completely obstruct public pedestrian <br />pathways or deny access to private property at any time. No streets shall be closed at any time. The <br />Contractor may establish “No Parking” zones, contiguous to the work area by posting signs. The City will <br />enforce parking restrictions only when the Contractor has posted the proper signs and has notified the <br />City Police Department a minimum of 48 hours in advance of the required restriction period. <br />DocuSign Envelope ID: 926FF83A-BD87-41CF-85CD-52D36EBBFD9B
The URL can be used to link to this page
Your browser does not support the video tag.