BID SUMMARYBID OPENINGDATE: November 2, 2022TIME: 3:00 P.M.LOCATION: City Clerk's OfficeITEMNO.ITEM UNIT COST ITEM COSTBASE BID1 Mobilization, Staging, and Stockpiling per Section 7-8.4 and 9-3.41 LS $50,000.00 $50,000.00 2 Temporary Traffic Control per Section 6001 LS $75,000.00 $75,000.00 3 Curb Cut Ramp Type A or B per Section 303-5.996 EA $7,500.00 $720,000.00 4 Curb Cut Ramp Type C or D per Section 303-5.9187 EA $6,500.00 $1,215,500.00 5 Dome and Landing Replacement per Section 303-5.960 EA $3,500.00 $210,000.00 6 Gutter Replacement per Section 303-5.929 EA $1,200.00 $34,800.00 7 Retaining Curb Replacement per Section 303-5.94 EA $1,000.00 $4,000.00 8 Sidewalk per Section 303-5.9 7500 SF $25.00 $187,500.00 9 Curb and Gutter per Section 303-5.9 1200 LF $115.00 $138,000.00 10 AC Tie In per Section 302 -5.9 1500 SF $40.00 $60,000.00 11 Concrete Valley Gutter / Apron per Section 303-5.92000 SF $38.00 $76,000.00 12 Curb Storm Inlet Adjustment within Ramp Flare per 303-1.1.120 EA $1,000.00 $20,000.00 13 Relocate roadside sign on new post per Section 31525 EA $750.00 $18,750.00 TOTAL BASE BID:$2,809,550.00 Prepared by: M. GoralkaAnnual Street Paving 2021-23Date Approved:November 2, 2022PROJECT TITLE:Curb Ramp Upgrades forPROJECT NO.:BID NO.:ENGINEER'S ESTIMATE2022.005022-23.003QUANTITY JJR Construction, Inc. FBD Vanguard Construction, Inc. Sposeto Engineering, Inc.1120 Ninth Avenue 550 Greenville Road 4558 Contractors PlaceSan Mateo, CA 94402 Livermore, CA 94550 Livermore, CA 94551Phone: (650) 343-6109 Phone: (925) 245-1300 Phone: (925) 443-4200Fax: (650) 343-6207 Fax: (925) 245-1007 Fax: (925) 443-6800UNIT COST UNIT COST UNIT COST$10,000.00 $10,000.00 $122,500.00 $122,500.00 $72,000.00 $72,000.00$30,000.00 $30,000.00 $50,000.00 $50,000.00 $45,000.00 $45,000.00$6,842.09 $656,840.64 $7,000.00 $672,000.00 $6,400.00 $614,400.00$5,194.65 $971,399.55 $6,420.00 $1,200,540.00 $6,400.00 $1,196,800.00$3,352.76 $201,165.60 $3,500.00 $210,000.00 $3,400.00 $204,000.00$1,808.23 $52,438.67 $1,200.00 $34,800.00 $1,350.00 $39,150.00$1,425.03 $5,700.12 $800.00 $3,200.00 $1,600.00 $6,400.00$23.84 $178,800.00 $14.00 $105,000.00 $18.00 $135,000.00$123.79 $148,548.00 $40.00 $48,000.00 $113.00 $135,600.00$41.88 $62,820.00 $14.00 $21,000.00 $23.00 $34,500.00$57.48 $114,960.00 $20.00 $40,000.00 $40.00 $80,000.00 **$660.90 $13,218.00 $2,100.00 $42,000.00 $2,800.00 $56,000.00$400.00 $10,000.00 $443.00 $11,075.00 $500.00 $12,500.00$2,455,890.58 $2,560,115.00 $2,631,350.00ITEM COST ITEM COST ITEM COSTMJG Curb Ramp Upgrades for Annual Street Paving 2021-23 Page 4 of 6Printed 11/3/2022 @ 5:11 PM
|